Similar Projects
Tree and Stump Removal - Streets and Maintenance
Alteration
Bidding
El Paso, TX

Picnic Area Maintenance
Post-Bid
Less than $34,900 est. value
TX

City Wide Palm Tree and Street Tree Maintenance
Term Contract
Post-Bid
El Paso, TX 79901

Pedestrian Gates
Results
El Paso, TX 79905

Campbell Building Courtyard Renovation-Shade Structures, Gates & Fencing-Package 1
Results
El Paso, TX

Herbicide Spraying
Term Contract
Post-Bid
El Paso, TX 79901

Renovations to Memorial Park Softball Field
Results
$1,200,000 est. value
El Paso, TX 79930

Liz Morayma Gonzalez Park Amenities and Landscape Improvements
Post-Bid
$900,000 to $1,100,000 est. value
El Paso, TX 79903

Student Memorial Park Improvements
Results
$319,857 est. value
El Paso, TX 79924

Douglass Landscape and Irrigation Improvements Phase Two
Post-Bid
El Paso, TX 79905

78--Sled Artificial Turf
Results
El Paso, TX 79916

Douglass Wrought Iron Fence Installation
Post-Bid
El Paso, TX 79905

Fence Project at Ft. Bliss, Texas
Results
El Paso, TX 79918

Parks Litter Control
Term Contract
Post-Bid
El Paso, TX 79901

Ft. Bliss Access Control Points
Results
Less than $50,000 est. value
El Paso, TX 79916

Last Updated 07/06/2021 06:37 AM
Project Title

Joey Barraza and Vino Memorial Park Phase II

Physical Address View project details and contacts
City, State (County) El Paso, TX 79934   (El Paso County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Fencing, Landscaping/Irrigation, Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $5,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the addition of a dog park and one soccer field addition to the existing park. The improvements lie between Joey Barraza and Vino Memorial Park formerly known as Northeast Regional Park and Redstone Park and includes minor modifications to Redstone Park to accommodate the improvements. The items included but are not limited to mobilization and demobilization, traffic control, construction signage, SWPPP, earthwork, minor demolition, electrical improvements, solar lights, benches, trash receptacles, pet waste stations, drinking fountain, conduit for future lighting, new chain link fencing, gates, sod, rock mulch, 4” thick concrete, rock walls, a new pre-fabricated bridge, signage, pre-fabricated sheds for irrigation and electric controls, trees, installation of 1 new 4” water meter, a new irrigation system and minor renovations to the existing Redstone Park irrigation.

Details

Park/Playground, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Industrial Furniture, Welding Benches, Site Furnishings, Trash and Litter Receptacles.
Division 22 - Plumbing, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 26 - Electrical, Exterior Lighting, Exterior Athletic Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents