Similar Projects
Douglas I-25 / Northbound and Southbound Lanes - I253121 - Converse County
Infrastructure
Conception
$7,291,000 CJ est. value
Douglas, WY 82633

Douglas I-25 / Northbound and Southbound Lanes - I253121 - Converse County
Infrastructure
Conception
$7,291,000 CJ est. value
Douglas, WY 82633

Wastewater Treatment Plant Cell Bypass Rehabilitation Project
Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Douglas, WY 82633

S. Downtown Alleys Improvements Project
Infrastructure
Bidding
$200,000 CJ est. value
Douglas, WY 82633

North 4th Street Improvements Project
Infrastructure
Post-Bid
$360,000 est. value
Douglas, WY 82633

Water Tank Overflow Pipe Installation Orin Junction Rest Area
Infrastructure
Post-Bid
$670,000 CJ est. value
Douglas, WY 82633

Dubois - Diversion Dam (Crowheart Section)
Infrastructure
Results
$200,000 est. value
Douglas, WY

Douglas Primary School Pavement Replacement Project
Infrastructure
Results
$514,307 CJ est. value
Douglas, WY 82633

Dollar General / Douglas
New Construction, Infrastructure - 10,542 SF
Pending Verification
$3,000,000 CJ est. value
Douglas, WY 82633

Douglas Youth Hockey Association Ice Arena
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Douglas, WY 82633

Glenrock Ross Road / Rolling Hills East / WY 59
Infrastructure
Conception
$4,436,000 CJ est. value
Douglas, WY 82633

Boxelder Road / WY 90 Structure No. DSM
Infrastructure
Conception
$1,039,000 CJ est. value
Glenrock, WY 82637

Douglas to Glenrock South / I-25
Infrastructure
Conception
$1,970,000 CJ est. value
Douglas, WY 82633

Douglas to Bill Walker Creek / WY 59
Infrastructure
Conception
$8,630,000 CJ est. value
Douglas, WY 82633

Douglas Cold Springs Road / South Section WY 91
Infrastructure
Conception
$3,125,000 CJ est. value
Douglas, WY 82633

Last Updated 06/06/2023 12:36 AM
Project Title

Boxelder Road Reconstruction - Phase 1

Physical Address View project details and contacts
City, State (County) Glenrock, WY 82637   (Converse County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $130,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Paving (Highway, Road or Street), Street/Roadway Reconstruction , Sitework/Excavating and Grading, Excavation, DOT Projects, Paving (Asphalt or Concrete) Description: Reconstruction of approximately 2.5 miles of County Road 17, generally beginning at the intersection of Hiser Road and extending south to the cattleguard where the pavement ends. The project generally consists of construction of excavation and embankment on steep grades, utilizing excavated materials to flatten slopes, and accommodate safety improvements. This occurs primarily along the realigned segment of the existing Boxelder Road. Overall, the Project generally includes approximately: 200,000 CY of unclassified excavation, 20,000 tons of crushed base gravel, 10,000 tons of asphalt pavement, and several other appurtenant bid items. Site Directions: Located south of Interstate 25 between Douglas and Glenrock. Take exit 160 off I-25. Proceed to US-87 and turn left onto State Highway 90 / Boxelder Road. County ownership of Boxelder Road begins at the end of State maintenance 2.9 miles south of the intersection with US-87.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents