Similar Projects
South Boulder Road Widening and Multi-modal Improvement Project
Post-Bid
Lafayette, CO 80026

High Country Training Center Improvements
Post-Bid
Frisco, CO 80443

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Platteville Boulevard Turn Lanes
Results
Pueblo West, CO 81007

Polo Club Place Drainage and Roadway
Renovation
Construction
Denver, CO

Falcon Highlands Maintenance Project
Post-Bid
Colorado Springs, CO 80903

County Road 509 Siphon Replacement Project
Results
Durango, CO 81301

Pedestrian Bridge and Abutment Landing
Post-Bid
Colorado Springs, CO

US50 and SH92 Delta Intersection
Results
$1,000,000 to $2,900,000 est. value
CO

Inspiration Lane Median Reconfiguration
Post-Bid
$110,000 to $130,000 est. value
Aurora, CO

County Line Road Improvement Project
Results
Less than $2,000,000 est. value
Longmont, CO 80501

Manitou Avenue Paving from El Paso to Ruxton
Post-Bid
Manitou Springs, CO 80829

2020 Pavement Rehabilitation - Street Improvement Program
Results
Less than $4,565,602 est. value
Castle Pines, CO 80108

Taxilane Paving Overlay
Post-Bid
Cortez, CO 81321

Horseshoe View Estates South PID Roadway Reconstruction
Results
$500,000 to $600,000 est. value
Loveland, CO 80521

Last Updated 12/08/2021 01:27 PM
Project Title

Co Flap Pit 82(1) Brush Creek Parking Area

Physical Address View project details and contacts
City, State (County) CO 81611   (Pitkin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,500,000 to $6,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located at the intersection of Colorado State Highway 82 and Brush Creek Road in Pitkin County, approximately 7 miles north of Aspen, Colorado. The scope of the project is to grade and pave 200 additional parking space and to repave the existing parking area. Additionally, the project would include safety lighting, utilities, landscaping, and construction of a new bathroom facility.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents