Similar Projects
Kinetic Park - Parking Lot Improvements
Infrastructure
Bidding
Dardenne Prairie, MO 63368

Construct a Parking Lot at Licking R-VIII High School
Infrastructure
Bidding
Licking, MO 65542

Spanish Pond ADA Improvements
New Construction
Post-Bid
MO 63138

Main Park and Heritage Park Sidewalk
Post-Bid
Washington, MO

Subdivision and Parking Lot Pavement Surface Preservation and Crack Seal
Results
$317,318 est. value
MO

Sidewalk Maintenance and Curb Ramp Construction
Term Contract
Results
$1,700,000 est. value
Springfield, MO

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Pedestrian Crossing Downtown
New Construction, Infrastructure
Pending Verification
$278,000 est. value
Columbia, MO

Olivette Community Trail Project - Curb Ramp
Infrastructure
Bidding
Olivette, MO

2021 Curb, Gutter, Sidewalk and Trail Program- Phase 1
Post-Bid
Gladstone, MO

Sidewalk Brick Band Replacement
Results
Kirksville, MO

Pinkerton Properties Warehouse
New Construction, Alteration - 24,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
O'Fallon, MO 63366

Brunswick Sidewalk Renovations
Term Contract
Bidding
Brunswick, MO

Shelby County R-IV School District-Parking Lot Improvements
Post-Bid
$850,000 est. value
MO

City Hall Parking Lot Maintenance and Improvements
Results
Weldon Spring, MO

Last Updated 09/03/2021 11:15 AM
Project Title

Trail Improvements on the Osage Trail Levee

Physical Address View project details and contacts
City, State (County) Warsaw, MO   (Benton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Trail Improvements on the Osage trail levee from Steamboat Landing Boardwalk to Highway 65. The Proposed work includes includes: Trenching and placing conduit, bedding & backfill, pulling wire, installing 48 pull boxes, constructing 52 light pole foundations, wiring and installing 52 light poles, and 2 electrical panels and meter assemblies, including conduit & wiring to power source.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents