Similar Projects
Alki Permanent Standby Generator
Alteration
Design
$6,000,000 est. value
WA

Cooling Tower Fill & Drift Eliminator Replacement
Renovation
Bidding
$60,000 CJ est. value
Vancouver, WA 98660

2022/2023 River Pump Station 1 and River Pump Station 2 Electrical Improvements Project
Renovation
Sub-Bidding
$320,000 CJ est. value
Pasco, WA 99301

State of Washington Military Department Generator Install
Renovation
Sub-Bidding
$300,000 CJ est. value
Moses Lake, WA 98837

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Post-Bid
$2,300,000 est. value
Medina, WA 98039

Electrical Construction Work Order 2021-2022
Term Contract, Alteration
Post-Bid
WA

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Bellevue Library Elevator Modernization for Car #3
Alteration
Results
Bellevue, WA 98007

Campus Electrical Grid Security Feeder 17 Expansion Project
Renovation
Construction
$856,000 CJ est. value
Ellensburg, WA 98926

Electrical On-Call Portwide 2022-4 and 2022-5
Term Contract
Sub-Bidding
$300,000 CJ est. value
Seattle, WA 98164

Auxiliary Utility Facility Generator Maintenance
Term Contract, Alteration
Post-Bid
Seattle, WA

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

Pioneer Turko Fiber Construction project
Infrastructure
Sub-Bidding
$700,000 CJ est. value
Seabeck, WA 98380

Battery Electric Bus Infrastructure Transformer Purchase
Alteration
Post-Bid
WA

Lakeland Hills Pump Station Generator Install
Renovation, Alteration
Results
$1,190,000 est. value
Auburn, WA 98092

Last Updated 09/07/2022 09:32 AM
Project Title

Norm Dicks Government Center Lighting Controls System Replacement Project

Physical Address View project details and contacts
City, State (County) Bremerton, WA 98337   (Kitsap County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $136,476 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 24th, 2022, project has not been awarded. No timeline of award was established. DESCRIPTION OF WORK: The Norm Dicks Government Center is in need of a replacement building lighting control system retrofit for the entire building. The existing lighting control system is at the end of its serviceable life and the entire system and associated components require replacement. COMPLETION OF WORK: The WORK must be completed within 120 calendar days after the commencement date stated in the Notice to Proceed. OBTAINING CONTRACT DOCUMENTS: Documents may be obtained by requesting them from Chris Mottner via e-mail at Chris.mottner@ci.bremerton.wa.us. Chris Mottner will email out the project documents and any addenda. When sending the e-mail, include contractor name, name of contact person, contact phone number, and email address. PROPOSALS: All bid proposals must be made on the forms furnished in the Project Documents. No electronic or facsimile bids will be accepted. PERFORMANCE BOND: The successful bidder will be required to provide a Performance Bond for 100 percent of the Contract Price. PRE-BID PROJECT INSPECTIONS: Pre-bid project inspections can be scheduled with the City of Bremerton Facilities team to inspect existing lighting controls, components and system configuration. It is the Bidders responsibility to become familiar with work areas, site conditions, existing systems and components and any other issues that may affect cost or performance of the project work. Building system inspection appointments are required.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents