Similar Projects
SR 539/Bay-Lyn Dr to International Boundary - Corridor Improvements
Infrastructure
Conception
$27,000,000 est. value
Lynden, WA 98264

D/B - GSA LPOE Pacific Highway, WA. Lane Expansion Project
Infrastructure
Design
$20,000,000 est. value
Blaine, WA 98230

SR 542/Squalicum Creek to Bellingham Bay - Fish Passage
Infrastructure
Design
$3,633,000 CJ est. value
Deming, WA 98244

RFQ D/B - I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

RFQ D/B - I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Road Overlay
Infrastructure
Post-Bid
Sumas, WA

Station 81 Site Preparation
Infrastructure
Post-Bid
Everson, WA 98247

Small Area Paving Project - 2021, CRP No. 921006
Infrastructure
Results
$190,000 to $220,000 est. value
Bellingham, WA

Water Main Relocation and Early Grading
Infrastructure
Results
Bellingham, WA

I-5/Squalicum Creek to SR 539 - Bridge Deck Overlays
Infrastructure, Renovation
Design
$825,000 CJ est. value
Bellingham, WA 98229

RFP General Contractor/Construction Manager Services - General Contractor/Construction Manager for Post Point Recovery Project
Infrastructure
Bidding
$5,000,000 CJ est. value
Bellingham, WA 98225

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

I-5/Slater Road Interchange - Improvements
Infrastructure
Design
$13,661,000 CJ est. value
Bellingham, WA 98229

Thornton Street, Vista Drive to Malloy Avenue Project
Infrastructure
Bidding
$4,750,000 CJ est. value
Ferndale, WA 98248

Last Updated 09/17/2022 04:31 AM
Project Title

South College Drive

Physical Address View project details and contacts
City, State (County) Bellingham, WA 98225   (Whatcom County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $930,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

South College Drive Improvements South College Drive PW787, a project involving replacing 16-foot wide median in South College Drive with asphalt, rechannelizing travel lanes, providing 133 angled parking spaces on the east side of the road, providing bicycle and pedestrian accommodations, and replacing plantings For questions, please contact project manager Sherrie Montgomery at (360) 650-6519, or email montgos6@wwu.edu.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents