Similar Projects
Groundwater Well Field and Transmission Construction - WIF32 - City of Bozeman
Infrastructure
Conception
$7,500,000 CJ est. value
Bozeman, MT 59715

Oak (Flanders Mill to Ryun Sun Way) - SIF057 - City of Bozeman
Infrastructure
Conception
$500,000 CJ est. value
Bozeman, MT 59718

Story Mill Road Reconstruction From Bridger to Griffin and Bridger/ Story Mill Intersection Improvements Project
Infrastructure
Design
$300,000 CJ est. value
Bozeman, MT 59715

Southside Lofts
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Bozeman, MT 59715

Glen Lake Rotary Park Phase 1 Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Bozeman, MT 59715

Westlake Park Improvements
Infrastructure
Bidding
$124,000 CJ est. value
Bozeman, MT 59715

Bozeman Public Library
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$4,500,000 CJ est. value
Bozeman, MT 59715

Municipal Groundwater Test Wells
Infrastructure
Post-Bid
$50,000 CJ est. value
Bozeman, MT 59718

2022 North 7th Avenue Water Renovations
Infrastructure
Results
$552,260 CJ est. value
Bozeman, MT 59715

Logan Landfill Phase 5 Landfill Expansion Earthwork
Infrastructure
Results
$3,790,244 CJ est. value
Three Forks, MT 59752

Joint City-County Law and Justice Center - Gallatin County and City of Bozeman
New Construction, Renovation, Infrastructure
Construction
$29,000,000 CJ est. value
Bozeman, MT 59715

Bozeman Gateway Phase 4 Apartments
New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
Bozeman, MT 59718

Bozeman Health Medical Clinic
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Bozeman, MT 59715

Timber Ridge Apartments
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Bozeman, MT 59718

Fowler Connection (Huffine to Oak) - SIF114 - City of Bozeman
Infrastructure
Conception
$8,000,000 CJ est. value
Bozeman, MT 59718

Last Updated 06/06/2023 06:06 AM
Project Title

Hyalite Dam and Reservoir Optimization Improvements - W79 - City of Bozeman

Physical Address View project details and contacts
City, State (County) Bozeman, MT 59718   (Gallatin County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $3,750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Armoring of the control tower (to enable some year-over-year storage capacity) and control upgrades to improve winter operation. Current vulnerability of Bozeman to drought is very high, due to the lack of sources that are robust in drought (large raw water reservoirs with year-over-year storage capacity, large rivers, or groundwater). Hyalite Reservoir is capable of providing year-over-year storage, but is not operated in that manner due to concerns of ice damage to the control tower. This increases the risk of an extremely dry year resulting in the inability to fill the Hyalite reservoir with enough water for the City and irrigation uses. This project could potentially remove the 20% surcharge the City pays for Hyalite releases. The project is included in the city's 2023-2027 Capital Improvement Program (CIP). As of December 15, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents