Similar Projects
Hamilton Correctional Center Wastewater Treatment Plant
New Construction
Conception
$1,072,600 est. value
Hodgen, OK 74939

Water Treatment Facility Replacement
New Construction
Conception
$2,000,000 est. value
Braggs, OK 74423

FY`22 Water Pollution Control Capital Equipment Replacements
Infrastructure
Bidding
Tulsa, OK 74107

FY`22 Water Pollution Control Capital Equipment Replacements
Infrastructure
Bidding
Tulsa, OK 74107

Kaw Lake Water Supply Program - Solicitation Group 3.00
Infrastructure
Post-Bid
Enid, OK

Kaw Lake Water Supply Program
Infrastructure
Post-Bid
Enid, OK

Hefner Water Treatment Plant Lime System
Renovation
Results
Oklahoma City, OK 73102

Water Treatment Plant Improvements
Renovation
Results
Holdenville, OK

Kaw Lake Water Supply Program - Solicitation Group 6.00 - Chestnut Watermain
Infrastructure
Bidding
Enid, OK 73703

Mohawk Water Treatment Plant Improvements High Service Pump Replacement and Variable Frequency Drive Addition
Addition
Post-Bid
Tulsa, OK 74127

AB Jewell Water Treatment Plant Clarifier No 2 Improvements
Alteration
Results
Tulsa, OK

Two (2) Chlorine Buildings Equipped with a Flow Paced Chemical Feed System
Renovation
Post-Bid
Jones, OK

WTP Residuals Asphalt Sludge Storage
New Construction
Results
Ponca City, OK

Water Scada Improvements Project
Infrastructure
Post-Bid
Lawton, OK

Ardmore Water Treatment Plant Variable Frequency Replacement
New Construction
Results
$150,000 est. value
Ardmore, OK 73401

Last Updated 04/22/2022 10:46 AM
Project Title

Ozone System Expansion/Upgrades

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73120   (Oklahoma County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $45,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents