Similar Projects
Starling Development - Phase 3
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
Kalispell, MT 59901

Willow Glen Wash Bay Addition - RB0218-03008 - Flathead County
Addition, Demolition, Renovation, Infrastructure
Conception
$1,026,250 CJ est. value
Kalispell, MT 59901

The Charles Hotel - Compass Construction
New Construction, Infrastructure - 86,000 SF
Design
$34,000,000 CJ est. value
Kalispell, MT 59901

Monterra Phase 2
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Whitefish, MT 59937

Mcinernie Creek Culvert Replacement Project
Infrastructure
Bidding
$350,000 CJ est. value
Hungry Horse, MT 59919

Armory Park Master Plan - Phase III
Infrastructure
Post-Bid
$1,300,000 CJ est. value
Whitefish, MT 59937

Armory Park Master Plan - Phase III
Infrastructure
Post-Bid
$1,300,000 CJ est. value
Whitefish, MT 59937

Lake McDonald Utility Relocation
Infrastructure
Results
$15,000,000 to $20,000,000 est. value
Kalispell, MT

Coram 200,000 Gallon Water Storage Tank
Infrastructure
Results
$1,584,606 CJ est. value
Coram, MT 59912

Creekside Commons
New Construction, Infrastructure
Pending Verification
$13,579,200 CJ est. value
Kalispell, MT 59901

Taco Bell Remodel - East Idaho Street / Kalispell
Infrastructure, Build-out
Pending Verification
$300,000 CJ est. value
Kalispell, MT 59901

Kay Beller Park to BNSF Loop Trail - City of Whitefish
New Construction, Infrastructure, Renovation
Conception
$2,100,000 CJ est. value
Whitefish, MT 59937

The Harper
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Kalispell, MT 59901

MT Flathead 486(1), North Fork of the Flathead River, MT FLAP FLATHD 2021(1), Blankenship and Belton Stage Road Resurfacing
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Columbia Falls, MT 59912

12th Avenue West Improvements Project
Infrastructure
Results
$991,301 CJ est. value
Columbia Falls, MT 59912

Last Updated 09/09/2022 12:42 PM
Project Title

Lift Station #9 Replacement Project

Physical Address View project details and contacts
City, State (County) Kalispell, MT 59901   (Flathead County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,425,562 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Est. Value: $ 2,000,000.00 Est. Completion Date: June 16, 2023 The City of Kalispell, Montana will receive sealed bids for the Lift Station #9 Replacement Project. The project primarily consists of furnishing materials, labor, and equipment required to install a new 500 gpm submersible lift station, pipe bursting 90 feet of 8-inch pipe to 10-inch pipe, 147 feet of 10-inch force main, bypass pumping, abandoning an existing lift station and connections to existing gravity mains. Also included in this project is a Bid Alternate which includes boring a portion of the force main rather than pipe bursting. The work consists of furnishing all labor, equipment, materials, and incidentals required to line the proposed wet well identified on the drawings by the installation of cured-in-place manhole (CIPMH) lining materials onto the proposed wet well structure (all interior concrete surfaces). Any conflict between the product manufacturers' recommendations and any portion of the contract documents shall be resolved with the Owner prior to proceeding with the work.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents