Similar Projects
FWTP Backwash Tank Interior Cleaning
Term Contract
Results
$450,000 est. value
Sacramento, CA

Tank 5 and 12 Recoat and Repairs
Infrastructure
Post-Bid
$2,179,500 est. value
Modesto, CA 95355

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

La Crescenta East and West Reservoir Rehab and Coating Project
Renovation, Alteration
Post-Bid
$900,000 est. value
Glendale, CA 91214

Aboveground and Underground Storage Tanks Monitoring, Maintenance, Testing, and Repair Services
Term Contract
Post-Bid
Redwood City, CA 94063

Tanks, Sumps and Accessories
Infrastructure
Post-Bid
West Sacramento, CA

Regional Groundwater Storage and Recovery Phase 2A
Infrastructure
Bidding
$3,600,000 est. value
Millbrae, CA 94030

USCG Novato Demolish Water Tower and Building 125 Pump House
Demolition
Post-Bid
$250,000 to $500,000 est. value
Novato, CA

Aboveground and Underground Storage Tank System Inspection, Testing, Maintenance, Repair and Certification Services
Infrastructure
Bidding
Sacramento, CA

Waterman Road Water Treatment Plant Tank no. 2 Rehabilitation Project
Infrastructure
Bidding
$1,210,369 est. value
Elk Grove, CA 95624

Skyline Water Tank Replacement Project
Infrastructure
Results
Millbrae, CA 94030

Reported 10/08/2021 12:00 AM
Project Title

Kern County Sheriff Lerdo Water Tank Replacement

Physical Address View project details and contacts
City, State (County) Bakersfield, CA 93308   (Kern County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project, in general, consists of the replacement of two water storage tanks, hydropneumatic tank, associated piping and foundations, electrical equipment modifications and connection to the existing system. Work shall be completed within two hundred and fifty (250) Working Days from the date when Contract Time commences to run.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents