Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Blue Heron Landing Park
Renovation, Demolition, Infrastructure, Alteration
Bidding

Turner Fairbank Highway Research Center Project VA ST TFHRC 50(5)
Post-Bid
$1,000,000 to $5,000,000 est. value
Fairfax, VA

Concrete and Joint Repair Services
Term Contract
Post-Bid
Lorton, VA 22079

495 Express Lanes Northern Extension (NEXT)
New Construction
Results
VA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Reston Spectrum Right Turn Lane
Renovation
Construction
Reston, VA 20190

Reston Metro Center Walkway
Alteration
Construction
Reston, VA 20191

Asphalt Milling Overlay and Traffic Marking - As Needed
Term Contract
Post-Bid
Vienna, VA

Pavement Restoration
Term Contract
Results
Less than $2,380,703 est. value
Fairfax, VA 22031

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Add Left Turn Lane
Results
Less than $4,099,000 est. value
VA

Wiehle Avenue at Washington and Old Dominion Trail Project
New Construction, Infrastructure
Post-Bid
Fairfax, VA

Multi-Use Trail Rehabilitation and Paving Projects
Results
Fairfax, VA 22030

2021 Latex Modified
Results
Less than $2,177,000 est. value
VA

Reported 04/15/2022 12:00 AM
Project Title

Route 29 Widening Phase Ii

Physical Address View project details and contacts
City, State (County) VA   (Fairfax County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $72,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is located in Fairfax County, Virginia. The project limits on Route 29 (Lee Highway) begin 0.208 miles west of Union Mill Road and extend to 0.460 miles east of Buckley’s Gate Drive for approximately 2.14 miles. The Project will involve the reconstruction and widening of Route 29 from four lanes to six lanes for approximately 1.6 miles of the 2.14 miles, while the remaining length involves the continuation of the shared-use paths along northbound side of Route 29 to provide better bicyclist and pedestrian access to the trails at the Fairfax County Parkway/West Ox Road interchange. In addition to the roadway widening, there will also be improvements to crosswalks at major intersections and modified signals to accommodate these new facilities, as well as modifying access to private residences via a frontage roadway. The proposed project objectives include improving capacity, vertical alignment, pedestrian connectivity, safety at conflicts, drainage facilities, and access management along Route 29.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents