Similar Projects
Orange County Southwest Service Area Potable Water Storage and Repump Facility and Avalon Road Master Pump Station
Bidding
Less than $18,954,291 est. value
Winter Garden, FL 34787

Bayshore Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $3,500,000 est. value
Tampa, FL 33602

Sulphur Springs Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $16,800,000 est. value
Tampa, FL 33602

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Professional Design Build Services for Construction Of The David L. Tippin Water Treatment Facility High Service Pump Station and Misc. Improvements
Results
Less than $50,000,000 est. value
Tampa, FL 33610

Bradley Road Booster Pump Station
Construction
Less than $7,884,680 est. value
Jacksonville, FL 32246

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

Phase I Wastewater Utility Upgrades
Results
Less than $2,703,260 est. value
Freeport, FL

City of Cape Coral Fire Station #2
New Construction - 10,559 SF
Construction
Fort Myers, FL 33990

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

Rehabilitation of Lift Stations 14A, 15C, 17B, 19C, and 20CA
Results
Coral Springs, FL

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

SRF Wastewater Improvements Phase IIA
Post-Bid
De Funiak Springs, FL 32433

Pineapple Park Irrigation Pump Replacement
Results
$50,000 to $75,000 est. value
Jensen Beach, FL 34957

Last Updated 11/19/2019 10:03 AM
Project Title

Downtown Doral PS0014 Reconstruction Sanitary Sewage Pump Station

Physical Address View project details and contacts
City, State (County) Doral, FL 33174   (Miami-Dade County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $2,569,209
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. The project consists of furnishing all materials, labor, and equipment necessary to Upgrade Sewage Pump Station No. 14, including, but not limited to, excavation, demolition and modification work including removal of existing dry well pumps, motors, valves, piping (suction and discharge) and fittings; partially remove and abandon existing dry well, manhole and wet well; Removal existing generator building, concrete slab, and not structural element including a licensed Asbestos Abatement Contractor as an OSHA Work Class II activity requiring adherence to the OSHA controls documentation, work practices, etc.; removal, transport, salvage and legal disposal of demolition material and equipment; Removal existing 6-feet high deco wall and replace it for 6' high fence with two (2) 12-feet access gate and one (1) 4-feet access gate; Remove and Relocate as required: palm trees, bush, existing water meter and connect line to existing service, existing RTU antenna; furnish, installation, operation, maintenance and removal of temporary sewage effluent by-pass pumps, providing 24 hours manned by pass pumping with primary and backup pumps; The project consist of constructing the two (2) wet wells, dry well and new manhole, including the design and construction of a cofferdam structure and concrete tremie seal and all required sheeting shoring and dewatering, furnish and install two (2) wet well and dry well concrete top slab; new 8-feet diameter manhole structure concrete and concrete top slab; furnish and install aluminum access hatches for two (2) wet well and dry well as shown on plans, emergency connection; furnish and install new two (2) Wet Well with a concrete protecting coating; furnish and install fans, blowers, ventilators and appurtenance, complete and operable as shown on plans; rehabilitation work to the existing receiving manholes upstream of the Pump Station 0014; furnish and install two (2) 3,100 gpm centrifugal vertical non-clog pumps and two (2) 150 HP, 900 RPM, 480 Volts motors and VFD combination related equipment; furnish and install two (2) flow meters system and related equipment in the vertical rising 12-inch discharge pipe; furnish and install new ER S049882 01 11 00-3 meter and main disconnect; furnish and install the proposed power/control system inclusive of the necessary electrical panel, enclosure, telemetry system and related equipment; install electrical conduits and junction boxes; install R.T.U. panel and S.C.A.D.A. equipment furnished by the Department; furnish and install a stationary engine-generator system and provide all equipments necessary in order to provide proper operation including all required synchronizing and transfer functions of the system but not necessarily be limited to day tank, muffler, exhaust pipe and supports, engine, generator; furnish and install a complete diesel fuel storage system to provide storage tank of 2,000 gallons of diesel fuel, access stairwells, and platform, tank mounting (reinforcement concrete slab upon the manufacturer's recommendations) and restraint system and fuel supply and return piping to/from the diesel duel day tank as shown on the Contract Drawings; electrical work; mechanical work; furnish all materials, equipment an supplies necessary for pump station startup and testing; furnish and install sewage force main pipe and fittings; connection to existing sewage force main; replacement of any sod, sidewalk, pavement damaged during construction; site restoration; and other appurtenant and miscellaneous items for a complete, satisfactory and functional installation. B. Pumping Station No.14 is located at 8340 NW 54TH Street, in Section 22, Township 53, Range 40 East, City of Doral, Florida 33174. C. It is the intent of the department to obtain a complete and working installation under this Project and any items of labor, equipment or materials which may reasonably be assumed as necessary to accomplish this end shall be supplied whether or not they are specifically shown on the Plans or stated herein.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents