Similar Projects
"Project Pumpkin" Distribution Center and Office Warehouse
New Construction - 673,186 SF
Design
$100,000,000 est. value
Huntley, IL 60142

Kane County Jail Drive Resurfacing
Alteration
Bidding
Saint Charles, IL 60174

2021 CDBG Resurfacing Program
Infrastructure
Bidding
Carpentersville, IL

Sewer Root Control Treatment
Term Contract
Post-Bid
Saint Charles, IL 60174

2021 Water & Sewer Division Emergency Repair
Term Contract
Post-Bid
Aurora, IL 60505

2020 Street Resurfacing Program
Results
Elgin, IL 60120

Reconstruct the Intersection of Anderson Road at Keslinger Road
Results
Elburn, IL 60119

2021 Eastside Resurfacing
Infrastructure
Bidding
Carpentersville, IL

Edgelawn Bikeway Project Phase 3 Construction Engineering Services
Renovation
Post-Bid
Less than $408,000 est. value
Aurora, IL 60505

5.6 Miles, Standard Overlay, ADA Improvements, Bridge Repairs, West Rd to Strom Dr in the City of Elgin
Results
Elgin, IL 60120

Alft Lane and Randall Road Improvements
Term Contract
Bidding
Elgin, IL 60123

Central Division - Asphalt Paving Maintenance
Post-Bid

Pavement Removal, Drainage Structures, Placement Of Subbase Granular Material, Hot-Mix Asphalt Pavement And Installation Of Thermoplastic Pavement Markings
Results
IL

Aurora Township 2021 Maintenance
Infrastructure
Bidding
IL

Site Paving
Post-Bid
Elgin, IL 60120

Reported 05/14/2021 12:00 AM
Project Title

2021 Polk Avenue Roadway and Utility Improvement

Physical Address View project details and contacts
City, State (County) Carpentersville, IL   (Kane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvements will consist of pavement removals, roadway excavation, roadway, curb storm sewer, sanitary and water main improvements, erosion control, restoration and all other ancillary work

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents