Similar Projects
Saddle Ridge
New Construction
Conception
Cheyenne, WY

Tenth Hole Estates - Phase III
New Construction - 3,000 SF
Conception
$1,000,000 to $5,000,000 est. value
Gillette, WY

Regrading and Resurfacing Project
Infrastructure
Design
$359,000 CJ est. value
Cheyenne, WY 82001

Irrigation System at the Pine Haven Area Cemetery
Infrastructure
Design
$380,000 CJ est. value
Pine Haven, WY 82721

Fubar Detention Dam Decommissioning
Infrastructure
Bidding
$5,000,000 CJ est. value
Cody, WY 82414

Scalehouse Replacements
New Construction, Infrastructure
Bidding
$320,000 CJ est. value
Lander, WY 82520

Shell Falls Power Grid Installation
Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Sheridan, WY 82801

Washakie Ranger District Office Fence Expansion
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Lander, WY 82520

Tunnel #2 Cave-in Restoration
Alteration
Post-Bid
Torrington, WY

Owner`s Representative for the Horizontal Infrastructure and Site Planning and Development
Infrastructure
Post-Bid
Jackson, WY 83001

District 3 Stockpiles
Infrastructure
Results

District 3 Stockpiles
Infrastructure
Results

Homestead Estates
New Construction
Construction
Cheyenne, WY

Dinosolar Solar Energy System
Infrastructure
Pending Verification
$266,617,340 CJ est. value
Casper, WY 82604

RFQ Contractor - WY FLAP 704(1) Skyline Drive and Fremont Lake Road
Infrastructure
Pending Verification
$10,000,000 CJ est. value
Pinedale, WY 82941

Last Updated 08/04/2022 10:05 AM
Project Title

Mountain Acres

Physical Address View project details and contacts
City, State (County) Casper, WY 82601   (Natrona County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected July 2021
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 7 lot residential subdivision. As of February 17, 2021, this project is in the early planning stages, and received recommendation of approval for the preliminary plat from the Natrona County Planning and Zoning Commission in November 2020. It will be reviewed by the Natrona County Planning Commission on March 9, 2021 and by the Board of County Commissioners on April 6, 2021 for final plat approval. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to second quarter of 2021.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments, 7 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents