Similar Projects
Cruise Terminal - Repair and Recoat Balcony Flooring
Alteration
Post-Bid
Mobile, AL 36602

Alabama Cruise Terminal - Replace Flooring in Elevator Cabins and Lobbies
Alteration
Post-Bid
Mobile, AL 36602

Michael Square Revenue Department LVT Flooring
Results
Mobile, AL 36609

Gym Flooring
Alteration
Results
$200,000 est. value
Dothan, AL

Carpet and Cove Base Installation
Term Contract
Post-Bid
Enterprise, AL 36330

TCS Annual Summer Floor Strip and Waxing
Term Contract
Results
$200,000 est. value
Trussville, AL

Stripping and Waxing Vinyl Composition Tile Floors - Andalusia Campus
Term Contract
Post-Bid
Sanford, AL 36421

Flooring Improvement
Alteration
Results
$200,000 est. value
Killen, AL

Replace Gymnasium Floor for Bessemer City Middle School
Alteration
Post-Bid
Bessemer, AL 35020

Corridor Flooring Renovations for Winston County Schools
Alteration
Results
$200,000 est. value
Double Springs, AL

Flooring Annual Contract
Term Contract
Post-Bid
Mobile, AL

High Performance Vinyl Flooring to be Installed in Portable Building
Renovation
Results
$21,687 CJ est. value
Mobile, AL 36602

Terrazzo Refurbishment
Alteration
Post-Bid
Mobile, AL 36602

Flooring - Library and Front Office
Renovation
Results
$59,718 CJ est. value
Grand Bay, AL 36541

Flooring Upgrades at Ashland Elementary School
Alteration
Post-Bid
Ashland, AL 36251

Last Updated 04/12/2023 12:51 PM
Project Title

Gym Floor Replacement At Holtville High School

Physical Address View project details and contacts
City, State (County) Deatsville, AL 36022   (Elmore County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $129,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Pre-Bid Walkthrough scheduled for 9:00AM Central Time, Wednesday, March 29, 2023, has been cancelled.. All General Contractors bidding these projects shall be required to visit the site(s) and examine all existing conditions prior to submitting their proposal, check-in at the principal's office prior to visit. The project shall be bid excluding taxes. Bids must be submitted on proposal forms furnished by the Architect or copies thereof. No bid may be withdrawn after scheduled closing for receipt of bids for a period of ninety (90) days. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owners judgment, the best interests of the Owner will thereby be promoted. A certified check or Bid Bond payable to Elmore County School District in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000.00 must accompany the bidder's proposal. Performance and statutory labor and material payment bonds will be required at the signing of the Contract. All RFIs and RFAs regarding the bid documents shall be sent and addressed through emails found on the RFI and RFA forms in the project manual. NOTE: ONLY THE RFI AND RFA FORMS IN THE PROJECT MANUAL WILL BE ACCEPTED. The Architect will not accept inquiries via telephone or fax.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents