Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Mill Levy 15A - Traffic Signals Construction
Infrastructure
Design
$4,464,210 CJ est. value
Denver, CO 80202

Mill Levy 15A - Traffic Signals Construction
Infrastructure
Design
$4,464,210 CJ est. value
Denver, CO 80202

SRTS - McAuliffe International School
Infrastructure
Sub-Bidding
$1,300,000 CJ est. value
Denver, CO 80207

SRTS - McAuliffe International School
Infrastructure
Sub-Bidding
$1,300,000 CJ est. value
Denver, CO 80207

Habitat For Humanity
Post-Bid
Denver, CO 80014

Cleaning Maintenance And Snow Removal
Term Contract
Post-Bid
Denver, CO 80202

East 64th Avenue and Denali Street Infrastructure Project
Results
Denver, CO 80202

East 64th Avenue and Denali Street Infrastructure Project
Results
Denver, CO 80202

Sheridan Station Mile High Development
New Construction - 138,566 SF
Construction
$10,000,000 est. value
Denver, CO 80214

Block 176
New Construction, Demolition - 767,123 SF
Construction
Denver, CO 80202

Resolicitation - Denver Fire Stations Fence Removal, Supply and Installation
Infrastructure
Sub-Bidding
$70,000 CJ est. value
Denver, CO 80202

Tower Farms
Post-Bid
CO

Design-Build Services for the 56th Avenue Widening Project - Peoria Street to Pena Boulevard
Results
Denver, CO 80238

Last Updated 08/12/2022 11:09 AM
Project Title

Marston Lake North Upstream of Glenbrook Pond, Phase 1

Physical Address View project details and contacts
City, State (County) Denver, CO 80202   (Denver County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $3,607,253 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The storm drain system improvements in the Marson Lake North Drainageway aim to separate stormwater flows from the Bowles Lateral, improve drainage and alleviate high ground water near the properties adjacent to the Bowles Lateral at Saratoga Place, and improve the overall drainage and reduce street flow through the project area. The new system will collect and convey flows from West Wagon Trail and South Field Way to the existing storm drain system downstream of the Glenbrook Pond. Storm flows will be separated from the Bowles Lateral with the improvements. All work on the Bowles Lateral will be completed in the off-season of the ditch. The project will be completed in two phases. Phase I is from the Glenbrook Pond outfall to upstream of the Bowles Lateral and includes installing 42- and 48-inch storm drain trunk line with laterals and inlets in West Garrison Street and South Garland Street, then crossing the Bowles Lateral to West Saratoga Place. Sanitary sewer and water lines will be adjusted as well as the Bowles Lateral which will be piped via 60-inch pipe. A headwall and wingwalls will be constructed at the culvert entrance. An 8-inch French drain will be installed along the new Bowles Lateral pipe in the vicinity of the ditch to collect groundwater. Curb Ramps, curb, gutter, and sidewalk replacement, as well as street restoration are also included. Between $2,350,000.00 - $2,850,000.00. 18% MWBE PREQUALIFICATION REQUIREMENTS: Each bidder must be prequalified in either category 1E(3) SEWER OPEN CHANNEL AND POND at or above the $3,000,000.00 monetary level or 1E(4) PIPED SEWER at or above the $3,000,000.00 monetary level. For this project, bids will ONLY be received and accepted via the online electronic bid service through QuestCDN. Contact QuestCDN Customer Support at 952-233-1632 or info@questcdn.com for assistance in membership registration, downloading digital project information and vBid online bid submittal questions.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents