Similar Projects
Restroom Renovations - Phase 1 at Pittsburgh Schiller School
Post-Bid
Pittsburgh, PA

Air Condition Art Rooms At Colfax K-8
Post-Bid
Pittsburgh, PA 15213

Capital Improvements to the Whitehall Elementary School
Results
Pittsburgh, PA

Restroom Renovations Pittsburgh Clayton
Renovation
Results
Pittsburgh, PA

Hillel Academy of Pittsburgh Phase I & Phase II
Renovation - 4,800 SF
Construction
$2,073,000 est. value
Pittsburgh, PA 15217

Pressley Ridge School Marshall Avenue Campus
New Construction, Renovation - 173,900 SF
Construction
$9,300,000 est. value
Pittsburgh, PA 15214

Unit Ventilators and Air Conditioning At Pittsburgh Minadeo Prek-5 School
Post-Bid
Pittsburgh, PA 15213

Renovation of the Third Floor Restrooms at North Alleghney Senior High School
Renovation
Results
PA

Waldorf School of Pittsburgh
New Construction - 1,300 SF
Construction
$400,000 est. value
Pittsburgh, PA 15224

Pool Filtration Repairs At Pittsburgh Colfax & Pittsburgh Westinghouse
Post-Bid
Pittsburgh, PA 15213

Spring Hill Restroom Renovations - Spring Hill Elementary
Renovation
Results
Pittsburgh, PA 15213

Gymnasium and Site Improvements for Existing Vocational School
Renovation - 468 SF
Construction
Pittsburgh, PA 15204

Finish Floors & Toilet Room Renovations at Pittsburgh Linden
Post-Bid
Pittsburgh, PA 15213

Addition and Renovations at West Liberty Elementary School
Renovation, Addition
Results
Pittsburgh, PA

Franklin Elementary School Renovations and Additions
Renovation, Addition
Construction
Sewickley, PA 15143

Reported 06/02/2019 12:00 AM
Project Title

Contractors to Renovate our Teacher's Lounge Area

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA   (Allegheny County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description
Details
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents