Similar Projects
Mother Of God Monastery Public Housing
New Construction, Renovation, Infrastructure
Conception
Watertown, SD 57201

PMP C- Neighborhood Street Reconstruction 5th Avenue NorthEast
Infrastructure
Bidding
$1,000,000 est. value
Watertown, SD 57201

Road Blading with a 20 Feet Road Top Maintenance, Snow Removal, Ditch Mowing, Gravel Hauling
Post-Bid
SD

Road Blading, Snow Removal, Gravel Hauling, Road Mowing, Dirt Work
Term Contract
Post-Bid
SD

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

10th Avenue North Reconstruction
Results
$1,500,000 to $2,500,000 est. value
Watertown, SD 57201

Loading and Hauling Gravel, Blading by the Hour and Mile, Mowing Road Ditches, Snow Removal by the Hourly Loading and Hauling of Crushed Gravel
Term Contract
Post-Bid
SD

Pavement Improvements
Results
$377,000 est. value
Kranzburg, SD

Road Blading, Snow Plowing, Gravel Hauling, Road Building
Post-Bid
SD

Haul Road Restoration
Infrastructure
Results
$11,000,000 to $12,000,000 est. value
Watertown, SD

Road Blading, Snow Removal, Gravel Hauling, Right-of-Way Mowing
Post-Bid
SD

Urban Grading (23K CuYd), PCC Surfacing (42K SqYd), Curb and Gutter, ADA, Lighting
Infrastructure
Results
SD

2021 Asphalt Paving - Schedules A, B, and C
Post-Bid
$175,000 est. value
Watertown, SD

Asphalt Patching Material
Term Contract
Results
Watertown, SD

Asphalt Mat
Infrastructure
Post-Bid
Watertown, SD

Last Updated 04/29/2022 09:16 AM
Project Title

2022 Pavement Rehabilitation - Large Patches

Physical Address View project details and contacts
City, State (County) Watertown, SD   (Codington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $152,361
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Schedule A consists of approximately 423 SY of asphalt removal, 672 SY of concrete pavement removal, 739 ton of base course, 1,095 SY of woven geotextile fabric, and 246 ton of asphalt concrete surfacing. Schedule B consists of approximately 805 SY of asphalt removal, 544 ton of base course, 805 SY of woven geotextile fabric, and 181 ton of asphalt concrete surfacing.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents