Similar Projects
Disaster Debris Collection Services
Term Contract
Sub-Bidding
East Fayetteville, NC 28301

Lot Cleaning 5329 Rodwell Road
Demolition, Infrastructure
Sub-Bidding
$70,000 CJ est. value
Fayetteville, NC 28311

Asbestos, Lead And Radon Assessment
Post-Bid
NC

Environmental Services to Support the City of Hendersonville Mud Creek Interceptor Replacement Project
Post-Bid
Hendersonville, NC

Lead Based Paint Testing and Asbestos Testing Services Pursuant
Results
Carthage, NC

Lot Cleaning Asbestos Abatement and Demolition
Demolition
Results
Fayetteville, NC 28314

Water Treatment Plant Demolition
Demolition, Infrastructure
Sub-Bidding
$280,000 CJ est. value
Maiden, NC 28650

Environmental Cleanup Program Support
Term Contract
Post-Bid
Fort Rucker, Redstone Arsenal, AL - Fort Gordon, GA - Fort Campbell, Fort Knox, KY - Fort Bragg, NC

Lot Clearing, Asbestos Abatement, and Demolition
Demolition
Results
Fayetteville, NC 28301

Invasive Vegetation Maintenance for UT West Branch Rocky River Mitigation Project
Term Contract
Sub-Bidding
Davidson, NC 28036

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Lot Clearing, Asbestos Abatement, and Demolition
Results
Fayetteville, NC 28312

Environmental Services
Alteration
Post-Bid
Eden, NC

Lot Clearing, Asbestos Abatement and Demolition
Demolition
Results
Fayetteville, NC 28301

New DHHS Campus - Demolition and Abatement Package
Demolition, Term Contract
Post-Bid
Raleigh, NC

Last Updated 08/17/2022 07:35 AM
Project Title

The Arbors at South Crossing - Demolition Bid Set

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27406   (Guilford County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Civil Engineer - 07/26/22
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work for this Single Prime Contract shall consist of the following items and all other work shown on the Plans and Specifications: Demolition of the north portion of the existing Smith Homes complex. Including, but not limited to, demolition and removal of existing buildings, structures, pavements, trees, and utility infrastructure and construction and maintenance of erosion and sediment control measures. The project will be demolished in phases so coordination with utility providers will be necessary to ensure service is not interrupted to occupied structures. All contractors are hereby notified that they must have proper license under State laws governing their respective trades, whether or not Federal Funding is involved. Contractors are notified that Chapter 87, Article 1, General Statutes of North Carolina will be observed in receiving and awarding Contracts. Each proposal shall be accompanied by a cash deposit or certified check drawn on some bank or trust company insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal or, in lieu thereof, a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Five Percent shall be based on the maximum bid price, i.e.: Base Bid plus Unit Prices plus Contingency Allowance plus All Alternates. Said deposit shall be retained by the Owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten (10) days after the award or to give satisfactory surety as required by law. Please note MWBE participation goal of 20%. Refer to provisions for Equal Employment Opportunity and payment of not less than the minimum salaries and wages indicated in the specifications must be paid on this project. A Performance Bond and a Payment Bond will be required for one hundred percent (100%) of the contract price. Payment will be made on the basis of ninety percent (90%) of monthly estimates and final payment made upon completion and acceptance of work. The bid opening will be accessible to individuals with handicaps. Individuals having special requirements should contact Kenneth Parks, at (336) 303-3162 no later than 48 hours prior to the established pre-bid conference date. The bidder's attention is called to the Section 3 HUD Act of 1968, as amended by the Housing and Community Development Act of 1992, and the requirements for a Section 3 Affirmative Action Plan; and the Standard Federal Equal Employment Contract Specifications set forth in the Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity, Executive Order 11246. The Bidder shall also comply with Section 504 of the Rehabilitation Act of 1973 as amended. Certifications shall be submitted by the Bidder evidencing understanding and compliance with the above-named requirements. Payment of not less than the minimum salaries and wages set forth in the Specifications must be paid on this project. Question & Answer period will conclude on Friday, August 12, 2022 with final responses provided by August 16, 2022 Duration for completion of the project is expected to be 7 months from Notice to Proceed. No bid may be withdrawn for a period of 90 days subsequent to the opening of bids, without the consent of the Greensboro Housing Authority. The Greensboro Housing Authority reserves the right to reject any or all bids.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents