Similar Projects
McHenry County Jail Shower Epoxy Finish Replacement Services
Post-Bid
Woodstock, IL 60098

183 CES Replace Metal Fascia P-36
Post-Bid
Less than $25,000 est. value
Springfield, IL 62707

Amp 2 Kitchen, Bathroom, And Flooring Upgrades
Renovation
Results
Springfield, IL 62702

Terminal Expansion - Phase 4 Signage
Renovation
Results
Rockford, IL 61109

Oak Park Central Pumping Station Drywall Repair and Painting
Post-Bid
Oak Park, IL 60302

DNR Des Plaines State Fish and Wildlife Area Concrete Floor Slab
Results
Wilmington, IL 60481

Roofing Systems, Exterior Building Maintenance
Term Contract
Post-Bid

2020 Water Pumping Station Exterior Facade Restoration
Results
$84,000 est. value
Homewood, IL 60430

Base of Stairwell Repair at Prosser High School
Post-Bid
Chicago, IL 60602

Maywood Fine Arts Exterior Remodeling
Results
Maywood, IL 60153

Willowbrook High School Security Vestibule
Results
Villa Park, IL 60181

Gymnasium Railing Replacement
Results
South Holland, IL 60473

Repair/Replacement Overhead Door Headers, Replce Siding, Update Exhaust System and Wash Bays
Results
Springfield, IL 62706

Fire Station No. 2 Exterior Improvements And Roof Replacement
Renovation
Results
Springfield, IL 62701

DNR Buel House- Repair Foundation Walls
Results
Springfield, IL 62702

Last Updated 02/09/2021 11:26 AM
Project Title

Housing Rehabilitation Program - Porch, Ada Ramp, & Cellar Door (Garner-Wahe)

Physical Address View project details and contacts
City, State (County) Rock Island, IL 61201   (Rock Island County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove old porch floor 5’x18’. Remove old columns. Build new porch floor 5’x13’. Treated 2x8 lumber for joist and 5/4 decking. Install new 6x6 columns to support roof above. Two handrails one 5’ and one 10’ per code. Permit required. Reframe R.O. for sloped metal cellar doors. Needs to be sealed from water penetrations and pests. Doors must be both active and be able to lock from the inside. Contact Jeff for information on the cellar. Install new ADA metal landing and 16’ meatal ramp with handrail. 16” rise to top of deck 1/12 slope. Contact Jeff for information on the ramp.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents