Similar Projects
Last Updated | 09/30/2022 03:35 AM |
Project Title | RFQ D/B - Repair Fire Pump B3426 |
Physical Address | View project details and contacts |
City, State (County) | Eielson AFB, AK 99702 (Fairbanks North Star County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,530,105 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | a. Contractor Name and Address: Alcan Builders, Inc. 3009 International ST, Fairbanks, AK 99701 b. CAGE Code: 0GMU1 c. Task Order Amount: $1,530,105.00 The purpose of this project is to to design and construct a replacement of an inoperable fire pump. This Statement of Work (SOW) describes the Governments requirement for the design, removal, and replacement of fire pump located in B3426 at Eielson AFB. The Contractor shall provide a design and construction in accordance with this SOW. Once the design has been completed and accepted by the Government, the Contractor shall demolish the existing fire pump and replace all components necessary to install a new fire pump. A. NAICS Code 236220 $39.5 Million B. The resulting contract will be a firm fixed price contract. See Section J for applicable attachments. C. The magnitude for this requirement IAW FAR 36.204(e), is between $500,000 and $1,000,000. D. Payment and Performance bonds shall be obtained IAW FAR 28.102. E. This acquisition is being designated for procurement as a Total Small Business Set-Aside. F. A site visit will be conducted with the end user, contractor, CE, and CONS for- 2 June 2022 12:00 pm Participants will meet at- BLDG 2310 Central ave, Eielson AFB. Alaska 99702. Each prime contractor is allowed to bring two personnel. If you are attending contact Oliver Ancans at oliver.ancans@us.af.mil AND Lisa Jenkins Fromm at lisa.jenkins_fromm@us.af.mil with the name(s) of the individual(s) who are planning on attending by 10:00 AM, AKST on 30 May 2022. No questions will be taken over the phone. G. Refer to Section L for proposal submission requirements. H. The Period of Performance is 228 Calendar Days after Notice to Proceed (NTP). Requirements The purpose of this project is to design and construct a replacement of an inoperable fire pump. This Statement of Work (SOW) describes the Governments requirement for the design, removal, and replacement of fire pump located in B3426 at Eielson AFB. The Contractor shall provide a design and construction in accordance with this SOW. Once the design has been completed and accepted by the Government, the Contractor shall demolish the existing fire pump and replace all components necessary to install a new fire pump. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Site visit Directions: Each prime contractor is allowed to bring two personnel. If you are attending contact Oliver Ancans at oliver.ancans@us.af.mil with the name(s) of the individual(s) who are planning on attending by 10:00 AM, ADST on 30 May 2022. |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |