Similar Projects
Thomas Metcalf School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$74,459,972 CJ est. value
Normal, IL 61790

University High School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$82,297,800 CJ est. value
Normal, IL 61761

Locust Street CSO Elimination and Water Main Replacement - Phase 4+5 Construction - City of Bloomington
Infrastructure
Design
$2,190,000 est. value
Bloomington, IL 61701

Outbound Charging Station Substation Foundation / Rivian Automotive
New Construction, Infrastructure
Design
$706,965 CJ est. value
Normal, IL 61761

stayAPT Suites / Normal
New Construction, Infrastructure - 56,900 SF
Bidding
$7,000,000 CJ est. value
Normal, IL 61761

New STEM Building Project Commissioning Services
Demolition, New Construction, Infrastructure
Bidding
Normal, IL 61761

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

110,000 Gallon Standpipe Rehabilitation
Infrastructure
Post-Bid
$500,000 CJ est. value
Arrowsmith, IL 61722

Sugar Creek Force Main Improvements
Infrastructure
Results
Bloomington, IL

Locust Street CSO Elimination and Water Main Replacement Phase III
Infrastructure
Results
Bloomington, IL 61701

Heartland Community College - Agriculture Complex
New Construction, Infrastructure - 30,322 SF
Construction
$16,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

The Trails at Sunset Lake
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Normal, IL 61761

Constitution Trail Extension - Lafayette Street to Hamilton Road - 40100100-70051 - City of Bloomington
Infrastructure
Conception
$320,000 CJ est. value
Bloomington, IL 61704

QuikTrip / Bloomington
New Construction, Infrastructure - 8,000 SF
Design
$4,000,000 CJ est. value
Bloomington, IL 61705

Last Updated 05/23/2023 07:35 AM
Project Title

Interceptor Sewer Grit Evaluation 2023

Physical Address View project details and contacts
City, State (County) Bloomington, IL 61701   (McLean County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of television inspection, grit evaluation, and manhole assessment of the District intercepting sewer system. The Bloomington and Normal Water Reclamation District (BNWRD) is inviting sealed Bid Proposalsfrom interested and qualified parties for the Interceptor Sewer Grit Evaluation 2023, generally including all labor, supervision, materials,supplies, transportation, equipment and services necessary and required as set forth in the Contract Documents. The Bidder may register for this project at the website in order to receive a username and password to access, view and print the Bidding Documents. For any questions or issues accessing the Bidding Documents from the website, contact the Office of the Engineer. Terms and Conditions will need to be accepted by the planholder prior to obtaining an electronic copy of the Bidding Documents on the Project Bidding website. Electronic Document access will only be provided to interested bidding companies and/or equipment companies. Electronic copies are provided at no cost. Printing of such documents will be the responsibility of the planholder in accordance with the website Terms and Conditions. A pre-bid conference will not be held. A certified check or bank draft payable to the order of the Bloomington and Normal Water Reclamation District or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Base Bid shall be submitted with each Bid.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents