Similar Projects
Lewis RA # 4, Jadwin Memorial S.F.; Stands B-76, 78 and D-9
Term Contract
Bidding
Harrisville, NY

St. Lawrence RA # 6, Brasher State Forest; Stand C-13.1
Term Contract
Bidding
Brasher Falls, NY

Chenango RA 16, Pitcher Springs State Forest; Stands A-59; B-18, 24, 25, 26, 28 and 47
Term Contract
Post-Bid
NY

Otsego RA 3, Hartwick State Forest; Stands B-1, 2.1, 2.2, 3, 8
Term Contract
Post-Bid
NY

Leachate, Sludge and Wastewater Hauling
Term Contract
Results
Penfield, NY 14526

Base Snow and Ice Removal
Results
Syracuse, NY

Waste Management Services Contract
Term Contract
Bidding
Mount Vernon, NY 10553

Refuse & Recycling Collection, Bullville, NY
Post-Bid
Bullville, NY 10915

Trash and Refuse
Term Contract
Results
Monsey, Spring Valley, Suffern, NY 10977

Snow Removal Services
Term Contract
Bidding
Calcium, Fort Drum, Watertown, NY 13601

Trash Removal Services
Post-Bid
Fort Edward, NY 12828

Collection and Disposition of Organic Waste
Term Contract, Infrastructure
Results
Yaphank, NY 11980

Rotterdam Wastewater Treatment Plant Sludge and Screening/Grit Hauling and Disposal
Term Contract
Post-Bid
Schenectady, NY 12306

Removal of Trash and Recyclables
Term Contract
Results
NY

Snow and Ice Removal
Post-Bid
Ardsley, Elmsford, Hawthorne, NY

Last Updated 11/18/2021 12:25 PM
Project Title

Removal and Disposal of Brine Wastewater from South Spur Well Field and Pump Station Site

Physical Address View project details and contacts
City, State (County) East Northport, NY   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pick up and remove brine waste water and to properly and lawfully dispose of said waste water. Perform each pump out of the waste brine tank within twenty-four (24) hours of notification. Furnish their own licensed waste removal truck(s) with a required total capacity (minimum, 7,000 gallons) for this Work. Provide all labor, equipment, hoses and pumps required to connect to, pump out, and disconnect from the existing waste brine tank pump out located outside the South Spur well field nitrate removal treatment system building.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents