Similar Projects
Site work for a golf course in Laurel, Maryland.
Infrastructure
Conception
$831,000 CJ est. value
Longview, WA 98632

Site work for a golf course in Laurel, Maryland.
Infrastructure
Conception
$831,000 CJ est. value
Longview, WA 98632

SR 504/N Fork Toutle River Kid Valley Bridge - Repair Girders
Infrastructure, Renovation
Design
$2,361,000 CJ est. value
Toutle, WA 98649

I-5/SB Toutle River Bridge - Painting
Renovation, Infrastructure
Design
$4,085,000 CJ est. value
Castle Rock, WA 98611

West Scott Avenue Asbestos Cement Waterline Replacement
Infrastructure
Bidding
$430,000 CJ est. value
Woodland, WA 98674

Cedar Street and 10th Street Sidewalk and 10th Street and Date Street Sidewalk
Infrastructure
Bidding
$383,000 CJ est. value
Kalama, WA 98625

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Lower Columbia College - Water Line Replacement - Vancouver
Infrastructure
Results
$72,000 CJ est. value
Longview, WA 98632

Rose Way Industrial Park Buildings 1 and 2
New Construction, Infrastructure
Results
$5,221,000 CJ est. value
Woodland, WA 98674

Waterfront Condominiums
New Construction, Infrastructure
Pending Verification
$15,500,000 CJ est. value
Woodland, WA 98674

46th Avenue Construction - City of Longview
Demolition, New Construction, Infrastructure
Conception
$3,650,000 CJ est. value
Longview, WA 98632

Beacon Hill Reservoir
Infrastructure
Design
$300,000 CJ est. value
Kelso, WA 98626

Ostrander Road Culvert Replacement Project
Infrastructure
Bidding
$1,000,000 CJ est. value
Kelso, WA 98626

Kelso High School Practice Field Improvements
Infrastructure
Post-Bid
$320,000 CJ est. value
Kelso, WA 98626

Last Updated 04/11/2023 01:04 AM
Project Title

SR 432/Washington Way Signal Replacement

Physical Address View project details and contacts
City, State (County) Kelso, WA 98626   (Cowlitz County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,008,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STIP ID 443211S08 Replace existing signal poles at this intersection. Replace existing illumination systems directly affected by the signal replacement and update ADA facilities to allow for a safer intersection. As of April 11, 2023, this project is in Final Planning status. Preliminary engineering has begun and environmental design is expected to be complete in the fourth quarter of 2022. The contract advertisement is expected in first quarter 2023 and construction is anticipated to be operationally complete in the fourth quarter of 2023. WSDOT - SR 432/Washington Way Signal Replacement Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents