Similar Projects
Adams Avenue Active Transportation Project - City Of Costa Mesa
Alteration
Conception
$3,750,000 est. value
Costa Mesa, CA 92626

City Hall - Cast Iron Drainage Repipe - City of Costa Mesa
Infrastructure
Conception
$300,000 est. value
Costa Mesa, CA 92626

Bay / Channel Crossings Water Main Replacement - 16W12 - City Of Newport Beach
Infrastructure
Design
$7,947,390 CJ est. value
Newport Beach, CA 92663

Water Main Replacement - Browning Ave - Beverly Glen to La Colina - 60172 - City of Tustin
Infrastructure
Design
$1,800,000 CJ est. value
Tustin, CA 92780

Construct a New Detention Basin
Infrastructure
Bidding
$4,170,000 CJ est. value
Placentia, CA 92870

West Irvine Terrace and Balboa Island Water Main Replacement
Infrastructure
Bidding
$3,900,000 CJ est. value
Newport Beach, CA 92625

Primary Sedimentation Basins No. 6-31 Reliability Improvements at Plant No. 1
Renovation
Post-Bid
$7,900,000 est. value
CA

Thickening and Dewatering Building Pipe Support Improvements at Plant No 1
Renovation
Post-Bid
$1,000,000 est. value
Fountain Valley, CA

CALLE REAL Waterline Improvements
Infrastructure
Results
$880,000 est. value
San Clemente, CA 92673

Industrial Streets (Phase I) Water & Sewer Main Improvements
Infrastructure
Results
$4,000,000 est. value
Santa Ana, CA 92701

Tewinkle Park Lakes Upgrades - 700137 - City of Costa Mesa
Infrastructure
Conception
Less than $1,000,000 est. value
Costa Mesa, CA 92626

Water Reclamation Plant (WRP) Odor Control Systems Replacement - City of San Clemente
Renovation
Design
$6,500,000 CJ est. value
San Clemente, CA 92672

Return Activated Sludge Discharge Piping Replacement at Plant No. 1
Renovation
Bidding
$4,833,167 CJ est. value
Fountain Valley, CA 92708

Trickling Filter Sludge and Scum Pumps Replacement at Plant No. 1
Renovation
Post-Bid
$1,729,000 est. value
CA

Miscellaneous Water Vault Rehabilitations - Nos. 10, 25, 49, and 94
Infrastructure
Results
$1,100,000 est. value
Anaheim, CA 92805

Last Updated 09/21/2022 07:34 AM
Project Title

Digester Gas Facilities Rehabilitation - J-124 - Orange County

Physical Address View project details and contacts
City, State (County) Fountain Valley, CA 92708   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected March 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $117,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project will replace the low and high pressure digester gas facilities at Plant No. 1 and No. 2 to meet current and future needs such as projected gas production and Air Quality Management District and National Fire Protection Association regulations. The Plant No. 1 work includes replacement of all compressors and flares and rehabilitation of the existing gas compressor building. The Plant No. 2 work includes construction of a new gas compressor building, and replacement of the flares and gas compressors. This project is included in the Orange County Sanitation District's FY 2020-2024 CIP. Per the owner, as of April 26, 2022, a design team has been selected. The owner also states that this project is anticipated to advertise for construction bids on December 14, 2023 with an anticipated bid opening on February 14, 2024. A firm timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents