Similar Projects
Center School Redevelopment
Renovation
Conception
$31,000,000 est. value
Stratford, CT 06615

Main Street Conversion
Renovation
Conception
$6,500,000 est. value
Bridgeport, CT 06604

Surf Avenue Multi-Residential
New Construction, Infrastructure
Design
$17,000,000 CJ est. value
Stratford, CT 06615

Hubbard Road Apartments
New Construction - 19,931 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Wilton, CT

Armstrong Court Phase 3
Renovation - 52,319 SF
Post-Bid
Greenwich, CT

Petremont Lane ClockTower Apartments
New Construction, Infrastructure
Post-Bid
$15,000,000 CJ est. value
Shelton, CT 06484

Construction Services at 341 Clinton Avenue
Renovation
Results
Bridgeport, CT

Site Ramps and Stairs Upgrades at Parish Court
Renovation
Results
$135,211 CJ est. value
Fairfield, CT 06825

River Breeze
New Construction - 97,180 SF
Construction
$11,600,000 est. value
Shelton, CT 06484

Station House
New Construction - 38,000 SF
Construction
$5,000,000 est. value
Greenwich, CT

Riverview Park Royal
New Construction, Infrastructure - 10,000 SF
Pending Verification
$34,000,000 CJ est. value
Shelton, CT 06484

Parklands Drive Apartments
Demolition, New Construction, Infrastructure
Pending Verification
$22,600,000 CJ est. value
Darien, CT 06820

Fairfield Avenue Mixed Use
New Construction - 57,450 SF
Conception
Bridgeport, CT

Flax Hill Road Redevelopment
New Construction, Renovation - 33,100 SF
Design
Norwalk, CT

East Main Street Redevelopment
New Construction
Post-Bid
Bridgeport, CT

Last Updated 05/02/2023 09:08 AM
Project Title

EIFS Replacement at Clinton Manor

Physical Address View project details and contacts
City, State (County) Stamford, CT 06901   (Fairfield County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

A formal selection is pending. The following companies submitted bids: •East Coast Wall Systems LLC •New York Stucco & General Construction LLC •TDR Interiors with Finish Contractors LLC Sealed bids will be received by Clinton Manor LLC for the removal and replacement of the existing Exterior Insulated Finishing System (EIFS) on the East and West facades of the existing residential building known as Clinton Manor. The North and South facades of the building were replaced in 2013 and shall remain in place and receive a new finish coat. Some areas may require patch and repair to the existing substate, and insulation board of the previously replaced area as required to support new resurfacing work. Clinton Manor is an existing 88 unit, 11 story building built 1976 in site located at 22 Clinton Avenue, Stamford, CT. Floors 3 through 11 are occupied by senior (ages +55) residents while floors 1 and 2 serve as the offices for Charter Oak Communities. The building will remain occupied by residents and office workers during the period of the EIFS work. Bidder's requests for interpretation will be received by the architect no later than Wednesday, March 15th, 2023, at 2:00 p.m. All procurement decisions shall be at the sole discretion of Charter Oak Communities. Charter Oak Communities reserves the right to waive any minor irregularities in any response when this action appears to be in its best interest. Charter Oak Communities is an Affirmative Action Equal Opportunity Employer.

Details

11 Stories Above Grade, Renovation, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents