Similar Projects
New Middle School
New Construction
Conception
Maynardville, TN

Virtual School Offices Build Out
New Construction, Renovation, Addition, Build-Out
Design
$4,000,000 est. value
TN

Upperman High School Expansion
Addition
Design
Baxter, TN 38544

Upperman High School Baseball Field Improvements
Renovation
Bidding
$14,000,000 est. value
Baxter, TN 38544

Construction of New West Wilson Middle School
New Construction
Bidding
$4,538,000 est. value
Mount Juliet, TN 37122

Montgomery Ridge Intermediate School Boiler Room
Renovation
Post-Bid
Maryville, TN 37803

EO Coffman Middle School
Renovation, Addition
Post-Bid
Lawrenceburg, TN 38464

Middle School - University of Memphis
Results
Memphis, TN 38111

Kingsbury High School Gymnasium
New Construction
Results
Memphis, TN 38122

Chambliss Classrooms
Renovation - 11,408 SF
Construction
Chattanooga, TN 37411

Kirkwood Middle School
New Construction
Construction
$35,000,000 est. value
Clarksville, TN 37043

Mid-South Gifted Academy
New Construction - 10,580 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Collierville, TN 38017

New Jasper Middle School
New Construction
Bidding
$5,800,832 est. value
Jasper, TN

Greene County Schools Improvement
Renovation
Post-Bid
Afton, Greeneville, Mosheim, TN 37745

ADA Accessibility Modifications at Northeast High School
Renovation
Results
Clarksville, TN 37040

Reported 05/05/2022 12:00 AM
Project Title

Interior Renovations for Science Hill High School

Physical Address View project details and contacts
City, State (County) Johnson City, TN 37604   (Washington County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Work shall include, but not be limited to: Demolition, abatement, civil, general construction, structural, fire protection, mechanical and electrical work required to renovate and upgrade classrooms, restrooms, corridors and relates support spaces at Science Hill High School.

Details

Middle/Senior High School, Renovation.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents