Similar Projects
Gas Regulator Station #15 Replacement
Bidding
Warner Robins, GA

Propane Air Mix Plant Emergency Reserve
Post-Bid
Robins Afb, GA

Renovations To Wastewater Treatment Pond
Post-Bid
Forsyth, GA 31029

SR 316 at Harbins Road Natural Gas Relocation
Results
Less than $948,610 est. value
Buford, GA

Natural Gas Pipeline to Serve Belmont S/D
Results
Social Circle, GA

2020 Natural Gas Reliability Upgrades
Post-Bid
Dalton, GA 30721

Natural Gas Pipeline to Serve the Oaks at Alcovy S/D
Results
Social Circle, GA

Steel Pipe 6 Foot Expansion - Provide and Deliver
Post-Bid
Cartersville, GA 30120

High Pressure Gas Main Extension Houston Lake Road
Results
Perry, GA 31069

Metering Infrastructure Equipment And Meters
Post-Bid
Cartersville, GA

Fuel Farm Installation
Results
Less than $159,875 est. value
Woodbury, GA

Natural Gas Main Replacement
Post-Bid
Monroe, GA 30655

Gas Main Installation
Results
Commerce, GA 30529

Jet Fuel Truck Tank/Pump Assembly Removal, Refurbish, and Re-Installation
Post-Bid
Dalton, GA 30720

S.R. 36 1.0 MG Elevated Storage Tank Rehabilitation
Results
Covington, GA 30014

Last Updated 01/09/2020 01:57 PM
Project Title

Relocate Fuel Farm

Physical Address View project details and contacts
City, State (County) Clarkesville, GA   (Habersham County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the relocation of the existing fuel farm at the Habersham County Airport. The fuel farm shall be relocated adjacent to the proposed FBO Building, whose construction is anticipated to commence in the spring of 2018. The relocation efforts shall consist of relocating two (2) existing above ground fuel tanks (1-AvGas;1-JetA), with selfserve capabilities. A new concrete pad will be constructed to support the tanks, as well as a spill containment area. The project scope also included minor grading and erosion control measures.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents