Similar Projects
Costco Distribution Center - Ho'opili Business Park
New Construction
Conception
Less than $50,000,000 est. value
HI

NAVFAC HI Jbphh Dry Dock 3 Service and Gallery Concrete Repairs
Renovation
Design
$8,000,000,000 est. value
Honolulu, Jbphh, HI 96860

Contractor - FY22 Repair Barracks Building 2077, Schofield Barracks, Oahu
Renovation
Design
$10,000,000 to $25,000,000 est. value
Schofield Barracks, HI

FY22 MCA - Child Development Center Schofield Barracks, Oahu, Hawaii
LEED Certification, New Construction, Infrastructure - 37,300 SF
Bidding
$50,000,000 CJ est. value
Honolulu, HI 96818

Farrington Highway Widening Kapolei Golf Course Road to Fort Weaver Road
Demolition, New Construction, Infrastructure
Bidding
$130,000,000 CJ est. value
Waianae, HI 96792

O&M and Repair - IDIQ MATOC Oahu Region
Term Contract
Sub-Bidding
Honolulu, HI 96813

Diamond Resorts Tank Booster Pumps 1 and 2 Replacements
Infrastructure
Sub-Bidding
$600,000 CJ est. value
Honolulu, HI 96813

U.S. Army Corps of Engineers, Honolulu District Sources Sought Synopsis for Small Business Construction Contractors Capabilities
New Construction
Post-Bid

$495M Unrestricted Multiple Award Task Order Contract (MATOC) for Design-Build and Design-Bid-Build Construction Services In The State of Hawaii
New Construction
Post-Bid
$25,000,000 to $100,000,000 est. value

NAVFAC HI Jbphh Bldg 154 Structural Repairs and Roof Replacement
Renovation
Results
$1,000,000 to $5,000,000 est. value
HI

NAVFAC HI JBPHH Replace Station G-16 In Facility 68
Renovation
Results
$1,000,000 to $5,000,000 est. value
Jbphh, HI

Substructure and Electrical Repairs at Pier 36
Infrastructure
Construction
$1,208,300 CJ est. value
Honolulu, HI 96813

Sheraton Princess Kaiulani Redevelopment
Demolition, New Construction, Renovation, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Honolulu, HI 96815

RFQ Design - Construction Management Services for Runways and Taxiways Shoulders Rehabilitation at Daniel K. Inouye International Airport
Infrastructure
Pending Verification
$100,000,000 CJ est. value
Honolulu, HI 96819

Mana'olana High Rise Phase 2
New Construction, Infrastructure
Design
$90,000,000 CJ est. value
Honolulu, HI 96814

Last Updated 08/08/2022 03:34 AM
Project Title

RFP D/B - NAVFAC HI - Building 479, ATAC Warehouse Office Install

Physical Address View project details and contacts
City, State (County) Honolulu, HI 96813   (Honolulu County)
Category(s) Government/Public, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Military Facility, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

This Design-Build Task Order is to create a formal ATAC Office and Breakroom within the ATAC Warehouse. Work in this task order involves enclosing approximately 1,025 square feet of the existing ATAC Warehouse to create a new office space and breakroom for ATAC personnel, in accordance with enclosures (1) and (2). The project duration is 410 days and is Prevailing Wage. Trades required: Temporary Facilities (Office & Storage Trailers, Portable Bathrooms, Temporary Fencing), Final Cleaning, HAZMAT Testing, Demolition, Mold & Lead Abatement, Concrete, Concrete Floor Prep & sealing, Concrete Staining, Metal Stud Framing, Casework, Insulation, Joint Sealants, Doors/Frames & Hardware, Aluminum Windows, Gyp Board, Resilient Flooring, Painting, Signage, Toilet Accessories, Countertops, Fire Sprinkler, Plumbing, HVAC, TAB, Controls, Electrical, Communications, Fire Alarm & Earthwork. Questions Due - 07/21/2022 5.00 AM HT RFI Deadline - 07/15/2022 7:00 AM HT *Amendment #2 has been issued for this project. Highlights from this amendment are: Government Issued RFI Responses. Issued Scope Changes. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. AN41-AAK JV, LLC DSQ-API JV, LLP Hawk-Niking, LLC Tokunaga-Elite JV, LLC Warfeather-GM JV, LLC N62478-22-D-4012 N62478-22-D-4013 N62478-22-D-4014 N62478-22-D-4015 N62478-22-D-4016

Details

1,025 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents