Similar Projects
Bay Mills Casino and Resort Expansion
Addition, Demolition, Infrastructure
Design
$65,000,000 CJ est. value
Brimley, MI 49715

Bay Mills Casino and Resort Expansion
Addition, Demolition, Infrastructure
Design
$65,000,000 CJ est. value
Brimley, MI 49715

Bay Mills Hotel & Resort Bid Package #2 / Brimley
Addition, Renovation, Infrastructure - 144,000 SF
Bidding
$50,000,000 CJ est. value
Brimley, MI 49715

Gun Range Improvements - Chippewa / Kinross Correctional Facility
Addition, Demolition, Renovation, Infrastructure
Bidding
$210,000 CJ est. value
Kinross Charter Township, MI 49788

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pit Cleaning-Bascule Bridges, Multiple Services
Infrastructure
Post-Bid

0.84 Mi of Hot Mix Asphalt Base Crushing, Shaping and Resurfacing, Concrete Curb and Gutter, Aggregate Shoulders and Pavement Markings on Industrial Park Drive From m-80 Southerly to Dolan Street
Infrastructure
Results
MI

1.59 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Sidewalk Ramps and Pavement Markings on Portage Avenue West from East Easterday Avenue to Osborn Boulevard
Infrastructure
Results
Sault Sainte Marie, MI

New Lock at the Soo, New Third Lock
Demolition, New Construction, Infrastructure
Construction
$1,300,000,000 CJ est. value
Sault Sainte Marie, MI 49783

St. Mary's River Soo Locks (Major Rehabilitation) - US Army Corps of Engineers
Infrastructure
Pending Verification
$37,300,000 CJ est. value
Sault Sainte Marie, MI 49783

Chippewa County International Airport - Rehabilitate Taxiway A
Infrastructure
Pending Verification
$1,054,039 CJ est. value
Kinross Charter Township, MI 49788

Hot Mix Asphalt Crack Seal, Warranty and Overband Crack Filling on Various Routes, Alger, Chippewa, Mackinac and Schoolcraft Counties
Infrastructure
Post-Bid
$580,000 est. value

4.90 Mi of Hot Mix Asphalt Crush, Shape, Cold Mill, Wedging and Resurfacing and Pavement Markings on 6 Mile Road From Brimley State Park East To i-75
Infrastructure
Results
MI

Demolition and Disposal ofExisting Rooms, and Remodel ofTwo (2) Cisler Center Guest Rooms, with Option of Splitting the Existing Two (2) Rooms into Three (3) Guest Rooms
Demolition, Build-out, Infrastructure
Post-Bid
$24,688 CJ est. value
Sault Sainte Marie, MI 49783

Foundation Drainage Upgrades
Infrastructure
Results
$200,000 est. value
Sault Sainte Marie, MI 49783

Last Updated 06/21/2023 01:10 PM
Project Title

20 Mile Rd forest Road- Improvements

Physical Address View project details and contacts
City, State (County) Pickford, MI 49774   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $286,400 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of June 21, 2023, bids were not awarded due to insufficient funds. No definite date for the rebid.**  20 Mile Rd forest road class A improvement - 2.68 miles between Hancock Rd and S Pea Line Rd Pickford Twp T44N, R1W, Sec 8,9 & 10 Project consists of 2.68 miles of forest road improvements; shape, level , grade, and fill existing roadway and replace 2 equalization culverts Questions Due 5/5/23 at noon. all questions should be emailed to Sharon Conley, at ConleyS2@michigan.gov. Completion by Nov 1, 2023 Provide lump sum pricing for the following (grading, shaping & filling): o Shape and level the existing subgrade roadbed using existing materials along the roadbed to a width of no less than 14'-0" This area is marked in "Blue" on map. o Shaping and leveling of the roadbed should result in drainage off the roadbed and maintain an approximate 14'-0" wide roadbed. o Cap each segment area with crushed gravel (23A) at a minimum of 4" thick; pit-run gravel may be used for spot filling existing holes and/or soft areas in the road. i. Areas where pit-run gravel is used to fill holes/soft areas, cap the pit-run with crushed gravel (23A) at a minimum of 2" thick. o Final shaping, leveling and the roadbed should result in drainage off the roadbed to maintain an approximate 14'-0" wide after new crushed and/or pit-run gravel is placed on awarded segment. o Install two (2) equalization culverts as listed on the map. i. One equalization culvert is 24" x 30' (marked on site). ii. One equalization culvert is 24" x 20' (marked on site). 1. Place riprap on each end of culverts installed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents