Similar Projects
Mold Cleaning
Results
Norfolk, VA 23551

Cold Storage Mold Remediation Services
Results
Virginia Beach, VA 23461

The Massey Building and Annex Demolition Project
Demolition - 166,000 SF
Construction
$10,000,000 to $20,000,000 est. value
Fairfax, VA 22030

Firing Range Maintenance Services
Results
Alexandria, VA 22312

F--Disposal of Low-Level Radioactive Waste
Results
Reston, VA

Hazardous Medical Waste Pickup and Disposal
Term Contract
Results
Chatham, VA 24531

Fats and Bones/Oil and Grease Removal Services
Results
Maxwell Afb, AL - Macdill AFB, Mayport, Panama City, Pensacola, Whiting Field, FL - Albany, Fort Stewart, Kings Bay, Robins Afb, GA - Picatinny Arsenal, NJ - Kirtland, NM - Wright Patterson Air Force Base, OH - Fort Worth, TX - Fort Myer, Norfolk, Portsmouth, Quantico, VA

Rental of Hazmat Containers
Results
Norfolk, VA 23511

Asbestos Abatement at Battle Hall
Results
Staunton, VA

Rental of 20 Ft. Hazmat Container
Results
Norfolk, VA

Asbestos Removal at VDOT Central Office
Term Contract
Results
Richmond, VA 23219

F--DOE EM Nationwide Deactivation, Decommissioning and Removal (DD&R)
Results

Asbestos Abatement Monitoring and Project Oversight at Air Route Surveillance Radar (ARSR) sites throughout the United States
Results
Seligman, AZ - Lincolnton, Marietta, GA - Maiden, NC - Albuquerque, Gallup, NM - Brecksville, London, OH - Clearfield, PA - Rogers, TX - Bedford, VA

Last Updated 01/15/2020 09:06 AM
Project Title

PD Basement Demo and Remediation

Physical Address View project details and contacts
City, State (County) Charlottesville, VA   (Albemarle County)
Category(s) Environmental
Sub-Category(s) Hazardous Waste Disposal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Microbial Growth Remediation at the address listed. Rooms affected will need to be placed under negative air pressure. Access to space as well as ducting from Negative air machine will have to be recirculated into air scrubbers. As this building cannot have a door to the street open for security reasons. Plastic containments will need to be built to prevent cross contamination. Furniture to be salvaged and cleaned will be stored on site (mostly just cabinets, table, chairs, and contents in the break room area). The demo and noisy portion of this project will need to be done after hours or on weekends to minimize the disruption of the courts above. Parking is also limited in the alleyway, however there is a parking garage next door for vehicles that will fit.

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents