Similar Projects
SLBE - E. 101st St. from Tracy to Forest Ave
Infrastructure
Bidding
Kansas City, MO

2021 Crack Sealing Project
Infrastructure
Bidding
Chesterfield, MO

2021 Mill and Overlay Program
Post-Bid
Gladstone, MO

Sidewalk Removal and Replacement
Alteration
Post-Bid
Potosi, MO 63664

Farm Road 115 and State Highway EE Roadway Improvements
Results
Springfield, MO

2021 - Subdivision Asphalt Overlay
Results
$146,500 est. value
MO

Missouri Bluffs Park Asphalt Project
Infrastructure
Bidding
Lake Saint Louis, MO 63367

2021 Asphalt Pavement Improvement
Infrastructure
Post-Bid
Jackson, MO

Asphalt Overlay Improvements
Results
University City, MO

Washington County Industrial Park Roadway Improvements
Infrastructure
Bidding
Potosi, MO

University Drive , Grobman Road and North Campus West Drive Paving
Infrastructure
Post-Bid

2021 Road Repairs
Infrastructure
Results
Kearney, MO

Resurface on Route Y in Jonesburg to 0.15 Mile West of West Warrenton Boulevard
Infrastructure
Bidding
$250,000 to $500,000 est. value

Asphalt Repair and Sealing
Infrastructure
Post-Bid
MO

2021 Partial Depth Repairs
Infrastructure
Results
Saint Peters, MO

Last Updated 09/18/2021 03:27 AM
Project Title

Resurface From 200 South of the Clinton Dekalb County Line

Physical Address View project details and contacts
City, State (County) (Daviess, Harrison Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $15,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Resurface from 200' south of the Clinton/DeKalb county line, near Cameron, to the Route 69, 10 miles south of Pattonsburg, the total length of improvement being 14.814 miles.(2) Job J1P3366 Route 69 DAVIESS County. Resurface from Route C to north of I-35, the total length of improvement being 8.812 miles (3) . Job J1S3431 Route N HARRISON County. Resurface from the I-35 interchange to east of Eagleville, the total length of improvement being 0.188 miles

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents