Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Air Handler Units and Parts
Term Contract
Bidding
Amarillo, TX 79108

5D4m-Replace Hospital Power Lines
Post-Bid
$25,000 to $100,000 est. value

Kitchen Hoods Replacement
Post-Bid
Amarillo, TX 79106

HVAC Maintenance for Amarillo TSVH
Results
Less than $35,664 est. value
Amarillo, TX

HVAC Equipment-Statewide
Results
Less than $44,107 est. value

HVAC and Mechanical Products
Term Contract
Post-Bid

125 -Ton Aircooled Chiller
Alteration
Results
$208,874 est. value
Amarillo, TX 79108

4140--Pharmacy USP Clean Room
Post-Bid
Amarillo, TX 79106

J045--New - Kd Chiller Inspections
Term Contract
Results
Kerrville, TX 78028

Transformer Testing and Maintenance on Switching Blades
Post-Bid
Falcon Heights, TX

Remove and Install 8 250K BTU Heating Units at the Airport
Alteration
Results
$50,000 est. value
Amarillo, TX 79111

Facility A/C Bacnet Repair
Post-Bid

Replacement of 400Hz and 28 Volt GPU's for Passenger Boarding Bridges
Alteration
Results
Amarillo, TX 79111

AMA Kitchen Hoods Replacement
Post-Bid
Amarillo, TX 79106

Last Updated 05/12/2022 12:35 PM
Project Title

J045--Kitchen Hood Controls Replacement

Physical Address View project details and contacts
City, State (County) Amarillo, TX 79106   (Potter County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor will furnish and install new systems to interface with the existing kitchen exhaust hood system. The Contractor shall supply all hardware, parts, tools, labor necessary to furnish and install the Intelli-Hood system(s) as specified below: IntelliHood Install Perform installation of demand ventilation controls for 1 kitchen Includes installation of the IntelliHood components. Intelli-Hood component work shall be completed by Melink Corporation authorized personnel. Work shall include but is not necessarily limited to: 1. Install temperature sensors 2. Install optic sensors and air purge units 3. Install hood controllers 4. Install low voltage cables between the hood controllers, air purge units, temperature sensors and optics sensors. IntelliHood Start Up - Perform startup of demand ventilation controls for kitchen. This shall be done by a Melink authorized personnel. Customer training is required during the start up. Intelli-Hood Service - Electrical Work shall be completed by a licensed electrician. Electrical work shall include but is not necessarily limited to: 1. Mount and power Intelli-Hood System Controller(s). 2. Install Touchpad(s) and conduit where cable is exposed. 3. Install VFDs. 4. Install CAT5 communication cables from the Intelli-Hood System Controllers to the VFDs. 5. Furnish and install all necessary non-Melink furnished control wire for system integration

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Special Exhaust Systems, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents