Similar Projects
Last Updated | 04/25/2023 02:34 PM |
Project Title | Single Point of Entry (SPOE) - Group 5A: Adams, Monte Vista, Davis, Monroe, Diamond, Heninger, Lincoln, Madison, Otsuka Site Building Services |
Physical Address | View project details and contacts |
City, State (County) | Santa Ana, CA 92701 (Orange County) |
Category(s) | Education |
Sub-Category(s) | Elementary School |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,645,165 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of April 25, 2023 , this project has not yet been awarded. The project is expected to be awarded on May 9, 2023. FBA Job Number: 558.094, 558.086.11, 558.086.12, 558.086.23, 558.086.16, 558.086.21, 558.086.26, 558.086.25 Job No - 17004-04, 17004-05, 17004-22, 17004-13, 17004-20, 17004-25, 17004-24 Project: Single Point of Entry (SPOE) - Group 5A: Adams, Monte Vista, Davis, Monroe, Diamond, Heninger, Lincoln, Madison, Otsuka Site Building Services License Requirements B Online Q&A No The District will conduct a voluntary informational job walk and conference relative to the Project. The location of that job walk and conference shall be at each school location in the order noted below. A. Davis Elementary School, 1405 French Street, Santa Ana, CA 92701 B. Heninger Elementary School, 417 W. Walnut Street, Santa Ana, CA 92701 C. Building Services Otsuka Site, 720 N. Fairview Street, Santa Ana, CA 92703 D. Adams Elementary School, 2130 Raitt Street, Santa Ana, CA 92704 E. Diamond Elementary School, 1450 S. Center Street, Santa Ana, CA 92704 F. Monte Vista Elementary School, 2116 W. Monta Vista Avenue, Santa Ana, CA 92704 G. Lincoln Elementary School, 425 S. Sullivan Street, Santa Ana, CA 92704 H. Madison Elementary School, 1124 E. Hobart Street, Santa Ana, CA 92707 I. Monroe Elementary School, 417 E. Central Avenue, Santa Ana, CA 92707 All questions regarding the Contract Documents are to be directed in writing to Tish Rubalcaba, Project Manager Bernards, Sean Williams, Project Engineer Bernards, & copy the District. All pre-bid request for information/clarification questions will be received until 4:00 PM on March 10, 2023. All questions or inquiries should be sent via e-mail to trubalcaba@bernards.com, swilliams@bernards.com & copy construction@sausd.us Work Included: The work to be performed by this prime contractor shall conform to the requirements of all of Division 00 and Division 01 as well as the Special Conditions, Project Performance Specifications (Division 02 through 33), all sheets in Drawings and other related documents (soils reports, addenda), and includes the furnishing of all supervision, labor, materials, tools, equipment, transportation, plan and services necessary therefore and incidental thereto to complete the project. If Reference is not made to a specific specification section, this does not relieve this prime contractor of his material obligation for specification sections that pertain to his work and are not mentioned herein. The work shall consist of, but not be limited to the following project procedures/scope: The following is additional information, instructions and detailed requirements for this Prime Contractors scope of work. Not all specification sections are mentioned below, only further detail of this Prime Contractors scope of work. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |