Similar Projects
New York State Department of Health, New York State Veterans Home at Oxford, Parking Lot Improvements and EV Charging Stations
Bidding
$180,000 to $190,000 est. value
Oxford, NY 13830

Roadway Improvements
Alteration
Bidding
Schenectady, NY

Beacon Main Street Accessibility Improvements/ Beacon Pedestrian Signal Improvements
Term Contract
Post-Bid
Beacon, NY 12508

Parking Lot Improvements at Dutchess County Stadium
Post-Bid
Wappingers Falls, NY 12590

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Results
Less than $1,600,000 est. value
Lake Placid, NY 12946

Sidewalk Safety Improvements
Alteration
Bidding
Fredonia, NY

District 14 Sidewalk Repair
Post-Bid
Watertown, NY 13601

Canalway Trail Lock E-18 To Route 167 On The Erie Canal
Results
Little Falls, NY 13365

Philson Walkways
Alteration
Bidding
Less than $50,000 est. value
Orchard Park, NY 14127

Hudson Hall Walkway Replacement
Term Contract
Post-Bid
Poughkeepsie, NY 12601

Cairo and Greenville Pedestrian Improvements
Term Contract
Results
Cairo, NY 12413

Milestrip Sidewalks
Alteration
Bidding
Less than $50,000 est. value
Orchard Park, NY 14127

Malone Sidewalk Extension and Pedestrian Crossing
Post-Bid
Malone, NY 12953

Lake Street Pedestrian and Bicycle
Term Contract
Results
Elmira, NY 14900

Reported 05/29/2021 12:00 AM
Project Title

Z1DA--528A8-16-807 Repair Parking Lots

Physical Address View project details and contacts
City, State (County) Albany, NY   (Albany County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Employee parking lot is approximately 5.6 acres and is divided into two sections with a total capacity of approximately 800 vehicles. Access is through three gated points with one other access point that is generally used for maintenance activities. The primary reason for the project is that there is a low spot in the parking area that is subject to persistent flooding, which has resulted in damaged vehicles. The flooding has been exacerbated by an ineffective drainage system within the parking lot as well as the City of Albany s combined sewer, which bisects the parking lot, being undersized and unable to remove rainwater during high intensity events. All located at the Albany VA Medical Center.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents