Similar Projects
CSO 55/Anthony and Wayne Relief Sewer
Infrastructure
Bidding
Fort Wayne, IN

Deep Dewatering Pump Station
New Construction
Post-Bid
Fort Wayne, IN

Pressure Sewer Grinder Stations
Renovation, Term Contract
Post-Bid
Fort Wayne, IN

Perry Lakes Lift Station Improvements
Results
Fort Wayne, IN 46802

Stormwater Drain Construction
Results
Fort Wayne, IN 46802

Storm Water Improvement Project
Infrastructure
Post-Bid
Fort Wayne, IN

Hartman Road Lift Station
Results
Fort Wayne, IN 46802

Gathings Lift Station Improvements
Results
Fort Wayne, IN 46800

Hessen Cassel Storm and Sidewalk Improvements
Results
Fort Wayne, IN 46800

Wagner Tile (Upper) Regulated Stormwater Drain Reconstruction Sections 19
Results
Less than $180,600 est. value
Fort Wayne, Yoder, IN 46798

Barr Street Flood Gate and CSO Gate Modifications
Results
IN 46800

Airport Expressway and Ardmore Avenue Stormwater Improvements
Results
Fort Wayne, IN 46800

Mayfield Road Stormwater Improvement and Water Main Extension
Results
Fort Wayne, IN 46800

Tillman/Calhoun Lift Station improvements
Results
Fort Wayne, IN

Blackhawk Addition Stormwater Improvements
Results
Fort Wayne, IN

Last Updated 01/21/2022 09:03 AM
Project Title

Nebraska Pump Station Modifications and Consolidation Sewer

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN   (Allen County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of a new consolidation sewer to connect existing combined sewers around Nebraska Pump Station to Drop Shaft No.6. Regulator structure shall be installed to manage flows in the existing combined sewer and be utilized to send flows to Drop shaft No.6 upon completion. Isolation structure to Drop Shaft No. 6 and a Vent structure coming from Drop Shaft No. 6 shall also be installed. Nebraska Pump Station building shall be removed in its entirety. Pumps at Nebraska Pump Station shall be refurbished/replaced along with all associated electrical equipment, controls, monitoring, and other appurtenances.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents