Similar Projects
Last Updated | 07/20/2020 03:13 PM |
Project Title | MSD Mull Building HVAC Renovations Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Asheville, NC 28804 (Buncombe County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Phase 2 includes replacing the air handlers. The existing air handling units shall be disconnected from the existing ductwork and hydronic piping systems and the new air handling units shall be reconnected in the original locations. This renovation will also include upgrades to the existing direct digital control system for the HVAC system with the addition of pump sensing equipment into the existing hydronic system. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |