Similar Projects
Z--CO-BACA NWR-Passage Ditch 9 &10
Term Contract
Bidding
$100,000 to $250,000 est. value
Crestone, CO 81131

Ledge Rock Center Public Improvements
Infrastructure
Bidding
CO

Precast Concrete Box Culvert
Post-Bid
Montrose, CO 81401

Grand Junction Re Various Culverts
Post-Bid
$1,000,000 to $5,000,000 est. value

Z--BLM CO NWD KFO Junction Butte Dsgn-Bld
Results
$25,000 to $100,000 est. value
Kremmling, CO 80459

Castle Rock Troop Office Retaining Wall Repair / Replacement and Lot Drainage
Results
Less than $325,000 est. value
Castle Rock, CO 80109

As Needed Culverts
Term Contract
Bidding
CO

Walker Phase 3B Manifold Tie-In Project
Post-Bid
Greeley, CO 80634

Kahil Storm Drainage Project
Results
Less than $1,072,736 est. value
Fort Lupton, CO 80621

Rec Center Pond Liner
Infrastructure
Bidding
Brighton, CO 80602

Culvert Pipe -Craig
Post-Bid
Lay, CO 81625

Groundwater Recharge Ponds Pilot Project
Results
Thornton, CO

Havana Park Pond and Del Mar Parkway Improvements
Infrastructure
Bidding
Aurora, CO

Copperleaf Water Quality Pond J Improvements
Post-Bid
$450,000 to $625,000 est. value
Aurora, CO

Quincy Intertie Improvements
Results
$7,400,000 to $8,400,000 est. value
Aurora, CO

Last Updated 01/28/2022 11:59 AM
Project Title

Root & Ratliff Salinity Control Pipeline Project

Physical Address View project details and contacts
City, State (County) Mancos, CO   (Montezuma County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,350,000 to $2,850,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Schedule 1 was awarded to Lewis Excavation Inc. Schedule 2 was awarded to Grand Junction Pipe Durango - Ferguson Project consists of the following improvements: Converting open irrigation ditch to an irrigation pressure pipeline, new diversion intake structure, new outlet structures, backfill existing ditches, and all necessary appurtenances.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents