Similar Projects
Marshall Construct Welding Technology Facility - Texas State Technical College
New Construction, Infrastructure
Conception
$15,300,000 CJ est. value
Marshall, TX 75672

American Cementing - Bulk Plant / Building Expansion
Addition, Demolition, Infrastructure - 9,375 SF
Design
$700,000 CJ est. value
Marshall, TX 75672

Mulberry Springs Baptist Church New Sanctuary
New Construction, Infrastructure - 19,800 SF
Design
$3,000,000 CJ est. value
Hallsville, TX 75650

Marshall Readiness Center Sanitary Sewer
Infrastructure
Post-Bid
$350,000 CJ est. value
Marshall, TX 75672

West Medill Street 6 Inch Water Main Improvements
Infrastructure
Post-Bid
Marshall, TX 75670

Cider Lane Improvements
Infrastructure
Results
$211,204 CJ est. value
Hallsville, TX 75650

TxCDBG Street and Sewer Improvements
Infrastructure
Results
$290,500 CJ est. value
Waskom, TX 75692

QuikTrip #7906 / Marshall
New Construction, Infrastructure - 8,292 SF
Construction
$1,000,000 CJ est. value
Marshall, TX 75672

Marshall Christian Academy Campus
Demolition, New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Marshall, TX 75672

Joe Pine Coffee
New Construction, Infrastructure - 3,705 SF
Design
$1,500,000 CJ est. value
Marshall, TX 75670

CEFCO Convenience Stores # 1117 / Marshall
New Construction, Infrastructure - 5,974 SF
Post-Bid
$894,300 CJ est. value
Marshall, TX 75672

Page Road (CR 3542) Reconstruction Project
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Marshall, TX 75672

Mt. Pleasant Cutoff (CR 3502) Reconstruction Project
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Marshall, TX 75672

Airlite Road (CR 4311) Reconstruction Project
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Marshall, TX 75670

Macedonia Road (CR 4103) Reconstruction Project
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Marshall, TX 75670

Last Updated 04/14/2023 09:15 AM
Project Title

500,000 Gallon Ground Storage Tank, ARPA Project

Physical Address View project details and contacts
City, State (County) Hallsville, TX 75650   (Harrison County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,822,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For Ground Storage Tank, ARPA Project The City of Hallsville, Texas will receive bids for 500,000 gallon ground storage tank, ARPA Project The project will consist of constructing one 500,000-gallon ground storage tank, related work, and appurtenances. A bid bond in the amount of 5 percent of the bid issued by an acceptable surety shall be submitted with each bid. A certified check or bank draft payable to the City of Hallsville, Texas, or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond. The project to be constructed will be financed with assistance from the American Rescue Plan Act (ARPA) program funded through the U.S. Department of the Treasury and is subject to all applicable Federal and State laws and regulations. Attention is called to the fact that not less than, the federally determined prevailing (Davis-Bacon and Related Acts) wage rate, as issued by the Department of Labor and contained in the contract documents, must be paid on this project. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual orientation, gender identity, or national origin. It is a requirement of ARPA, that the awarded applicant must be registered and not be debarred. All contractors/subcontractors that are debarred, suspended, or otherwise excluded from or ineligible for participation on federal assistance programs may not undertake any activity in part or in full under this project. The City of Hallsville is an Af rmative Action/Equal Opportunity Employer. Section 3 Residents, Minority Business Enterprises, Small Business Enterprises, Women Business Enterprises, and Labor Surplus Area rms are encouraged to submit bids. The City of Hallsville reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by the City of Hallsville for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder's qualifications prior to the contract award. Engineer's Estimate - 650,000.00 MBE (22.8%), WBE (6.9%) Bid Result. SCHEDULE A - McInnis Brothers Const., Inc. $710,000.00 SCHEDULE B - McInnis Brothers Const., Inc. $1,112,000.00

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents