Project Title | Wastewater Treatment Facility Primary Clarifier No - 2 |
Physical Address | View project details and contacts |
City, State (County) | Watertown, SD (Codington County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,300,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project includes the following Work: Replacement of an existing 85 foot diameter primary clarifier at the Watertown South Dakota Wastewater Treatment Facility. The project generally includes removal of the existing concrete, mechanism and under-slab piping and replacement with new, as well as removal of all demo material and site restoration (regarding, seeding, sidewalk replacements, etc.). The existing primary clarifier has an aluminum dome cover that will be reused. The Contractor will remove it prior to demolition of the existing clarifier and re-install on the new clarifier structure when completed. Modifications to the aluminum dome are also required, removing the existing effluent launder aluminum access hatches and replacing with fiberglass access covers. |
||||||||||||||||||||||||||||||||||||||||||
Details | Sewage Treatment Plant, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |