Similar Projects
Monroe Court Water Main: 70th to 72nd - WA08-01 - City of Urbandale
Infrastructure
Conception
$344,500 CJ est. value
Urbandale, IA 50323

Heeb Street Reconstruction - City of Dubuque
Infrastructure
Conception
$300,000 est. value
Dubuque, IA 52001

Hangar Pavement Rehabilitation Phase 2 - City of Mason City
Infrastructure
Design
$340,000 CJ est. value
Mason City, IA 50401

2022 HMA Alley Reconstruction Project
Infrastructure
Design
$57,000 CJ est. value
Clear Lake, IA 50428

Hwy 71 Raw Watermain Installation
Infrastructure
Bidding
$700,000 CJ est. value
Milford, IA 51351

Southeast Iowa Regional Airport: Construct Community Business Hangar
Infrastructure
Bidding
$2,000,000 CJ est. value
Burlington, IA 52601

Bee Branch Stormwater Pumping Station Project
Demolition, New Construction, Infrastructure
Post-Bid
$15,780,000 CJ est. value
Dubuque, IA 52001

Asphalt Alleys & Dead-End Street Resurfacing
Infrastructure
Post-Bid
$400,000 CJ est. value
Clinton, IA 52732

Cedar Rock State Park New Fueling Station
Infrastructure
Results
$15,701 CJ est. value
Independence, IA 50644

Bridge Replacement on Chesterman Road Project
Demolition, New Construction, Infrastructure
Results
$118,741 CJ est. value
Peosta, IA 52068

Fourth Street Park Building - City Of Waukee
New Construction, Infrastructure - 2,373 SF
Pending Verification
$18,736,000 CJ est. value
Waukee, IA 50263

Aikey Auto Salvage Storage Building
New Construction, Infrastructure - 5,200 SF
Pending Verification
$560,000 CJ est. value
Waterloo, IA 50703

Green Alley Water Main Improvements - 740-2044 - City of Dubuque
Infrastructure
Conception
$660,000 CJ est. value
Dubuque, IA 52001

Dubuque Community YMCA/YWCA
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Dubuque, IA 52001

Nutrient Reduction Wetland Project
Infrastructure
Bidding
$280,000 CJ est. value
Waterloo, IA 50701

Last Updated 09/20/2023 03:01 AM
Project Title

Nutrient Reduction Wetland Project

Physical Address View project details and contacts
City, State (County) Allison, IA 50602   (Butler County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $210,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work involves, but is not limited to, selective clearing, excavation, grading, tile and SUDAS inlet structure installations, , and seeding. This project includes around 1,000 cubic yards of earthwork, 1,412 linear feet of RCP tile installation, 3 SUDAS structures, 2,000 linear feet of silt fence, and 2.6 acres of seeding. Bids must be submitted on the appropriate bid forms provided and shall include a bid bond in the amount of ten percent (10%). Bidders must also be registered with the Iowa Division of Labor. The successful bidder shall be required to furnish a Performance/Payment Bond in an amount equal to one hundred percent (100%) of the contract price. Questions concerning the Plans and Construction Specifications should be in writing and addressed to Jon Rosengren, P.E., Jon.Rosengren@bolton-menk.com, and must copy Tracy Bruun, Division, tracy.bruun@iowaagriculture.gov. All other questions concerning other Contract Documents should be addressed to Tracy Bruun, Division, tracy.bruun@iowaagriculture.gov or 515-344-6279. In order to be considered in a final addendum, written questions must be received by 3:00 PM on September 12, 2023. The Division reserves the right to reject any or all proposals and to waive technicalities and irregularities *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. In general, the work involves, but is not limited to, selective clearing, excavation, grading, tile and SUDAS inlet structure installations, , and seeding. This project includes around 1,000 cubic yards of earthwork, 1,412 linear feet of RCP tile installation, 3 SUDAS structures, 2,000 linear feet of silt fence, and 2.6 acres of seeding. The estimated construction cost range for this project is $170,000 to $210,000.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents