Similar Projects
Hildebrand Holdings Winter Street Building Renovation
Renovation - 7,405 SF
Conception
Delaware, OH 43015

Community Garden Accessory Structure
New Construction - 400 SF
Design
Less than $500,000 CJ est. value
Westerville, OH 43082

Whittier Tower
New Construction, Renovation, Demolition
Design
Columbus, OH

Liberty Township Park Sanitary Sewer Home Road and Lift Station Abandonment and Sanitary Sewer Liberty Road North
Demolition, Infrastructure
Bidding
$607,000 CJ est. value
Powell, OH 43065

Pre Engineered Metal Buildings Project
New Construction - 12,000 SF
Post-Bid
$2,000,000 est. value
Lewis Center, OH 43035

Replacement of the Scioto Township Hall Parking Lot
Alteration
Post-Bid
$700,000 est. value
Ostrander, OH 43061

Statewide Boat Storage Facilities
New Construction
Results
$2,900,000 est. value
Logan, Millersport, Mogadore, Ravenna, OH

DOSD-SWWTP-Waterchamps-210432
New Construction
Results
Columbus, OH

Germain Volkswagen / Westerville
New Construction, Infrastructure - 26,000 SF
Pending Verification
$6,900,000 CJ est. value
Westerville, OH 43081

Lucy Ridge Apartments
New Construction, Infrastructure
Pending Verification
$106,000,000 CJ est. value
Delaware, OH 43015

The Mill on Flax
New Construction, Infrastructure - 8,000 SF
Design
$38,000,000 CJ est. value
Delaware, OH 43015

Multi-Use Baseball Diamond at Scioto Township Park
Infrastructure
Post-Bid
$90,000 CJ est. value
Delaware, OH 43015

Small Abandoned Mine Land Emergency Reclamation
Infrastructure
Results
$93,850 est. value
Columbus, OH

Addison Farms
New Construction, Infrastructure
Pending Verification
$265,000,000 CJ est. value
Delaware, OH 43015

Pittsburgh Drive Business Park
New Construction
Design
$18,000,000 est. value
Delaware, OH 43015

Last Updated 10/12/2022 10:35 AM
Project Title

WWTP Maintenance Building Addition

Physical Address View project details and contacts
City, State (County) Delaware, OH 43015   (Delaware County)
Category(s) Commercial, Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction start expected October 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $302,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of 10/12/22 - Per Blake Jordan there are no plans to rebid this project as it was deemed unfeasible due to pricing. The construction of a new maintenance facility that will be approximately 36' X 40' in dimensions. The facility will be located and constructed on City property, immediately adjacent and connected to the former pretreatment building (now retrofitted operations building). Prospective Bidders may address inquiries to Perry Mickley at (740) 203-1904, pmickley@delawaeohio.net, or through the Bidding Website. All inquiries must be submitted no later than Monday November 1, 2021 at 9:00 a.m. local time. No Bidder may withdraw his/her Bid within sixty (60) days after the actual date of the opening thereof. The City of Delaware reserves the right to reject any or all Bids, to waive any informality and to award the Bid or Bids to the lowest responsive and responsible Bidder as deemed to be in the best interest of the City, as determined by the City Manager. Contract Bond: The successful Bidder, who, as a Bid Guaranty, submits a certified check, cashier's check, or irrevocable letter of credit in an amount equal to 10% of the bid in accordance with paragraph above, shall furnish a Contract Bond in the form Contract Bond included in the Bid Documents in an amount equal to 100% of the Contract Sum. Bond forms are not acceptable The City of Delaware reserves the right to reject any or all Bids, to waive any informality and to award the Bid or Bids to the lowest responsive and responsible Bidder as deemed to be in the best interest of the City, as determined by the City Manager. Base Bid: $258,000 - $302,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The project has an expected duration of about 6 months (We will work with the contractor in terms of start and finish dates, the project will however need to be completed by the end of 2022). 4. BUILDING AREA (506.0) Allowable Building Area per Floor: 9,000 St Actual Building Area: 1,600 Sf (EXISTING) +1,415 Sf (ADDITION) = 3,015 Sf (TOTAL) The construction of a new maintenance facility that will be approximately 36 X 38 in dimensions. The facility will be constructed as a pre-engineered metal building and will be located on City property immediately adjacent and connected to the former pretreatment building (now retrofitted operations building). The project has an expected duration of about 6 months (We will work with the contractor in terms of start and finish dates, the project will however need to be completed by the end of 2022). Job No. 2020252.0 There will be no awarded Bidder for the above-mentioned project. The project has been postponed until further notice.

Details

3,015 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents