Similar Projects
Reported | 05/11/2022 12:00 AM |
Project Title | Road Materials |
Physical Address | View project details and contacts |
City, State (County) | Alliance, OH (Stark County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Aggregates |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Limestone: #4, #6, #8, #9, #10, #1minus, #1, #304, #2, #411, #617 Slag: #1x, #2x,#3x,#4x, #57, #6,#7x,#8x Gravel:#4,#8,#6 or #57,#9 or grit, crusher run Total estimated need for the next 12 month period - 3,000 tons more or less. Materials may be bid individually; may be bid F.O.B. plant or township yard, located at 14134 Greenbower St. NE, Alliance, Ohio 44601. Asphalts, Liquid Asphalts, Road Oils: MC-30 and MC-70 applied on township roads, price per gallon. MC-3,000 Weatherall Asphalt, applied on township roads, price per gallon. AE-90G Asphalt, price per gallon CR-2 Asphalt Emulsion, applied on township roads, price per gallon. SS1 Tack, applied on township roads, price per gallon Onyx Micro Surface Liquid, applied on township roads, price per gallon #404, #402 and #412 hot mix, F.O.B plant, price per ton. SS-921 cold mix; HPM; F.O.B. plant, price per ton. JASA High Performance Cold Patch, F.O.B, plant, price per ton. Expected need for the next 12 month period for liquid asphalts-20,000 gallons more or less. Expected need for hot and cold mix for the next 12 month period-3,000 tons more or less. Materials may be bid individually. Blacktop Overlay: #402 Two and one half inch Bituminous Overlay. #404 One and one half inch Blacktop Overlay. Crack Seal: Crafco Poly-fiber sealant #34544. Pre-packaged, pre-mix or equivalent applied to township roads. Roadsaver 515T. Pre-packaged, pre-mix or equivalent applied to township roads. Roadsaver 34221. Pre-packaged, pre-mix or equivalent applied to township roads. Material and labor to be bid separately. Expected need for overlay and Crack Seal to be determined by Road Superintendent. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |