Last Updated | 05/24/2023 08:02 AM |
Project Title | 2023 Cedar Street Improvement Project |
Physical Address | View project details and contacts |
City, State (County) | Cortez, CO 81321 (Montezuma County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,596,803 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of May 23, 2023, project was awarded to Candelaria Construction, Inc., and the awarded amount is $1,596,803.04** The project consists of the installation of approximately: 7500 SY of roadway excavation, base course fill, and asphalt paving. Concrete Flatwork: 640 LF of curb & gutter; 115 SY of curb ramps; 180 SY of sidewalk. Waterline Removal: 1740 LF of 6-inch cast-iron line; 5 EA metallic service lines. Waterline Installation: 1740 LF of 8-inch water line; 5 EA service line connections, house services, and all fittings. Sewer Main: remove and replace 1540 LF of 8-inch sewer main, 4 manholes, and new house service connections. All work is located within the Cortez City limits. Contractor must attend mandatory pre-bid meeting to bid. Bids placed before the mandatory pre-bid meeting shall be invalidated by non-attendance. Question Acceptance Deadline 03/29/2023 12:00 PM EDT |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |