Similar Projects
Schedule II - Slab Replacement and Drainage Repair
Infrastructure
Bidding
$83,398 CJ est. value
Colorado Springs, CO 80916

Betasso Water Treatment Facility Disinfection Capacity and Corrosion Control Project
Renovation
Bidding
$25,000,000 CJ est. value
Boulder, CO 80302

Colorado Springs Plumbing
Term Contract
Sub-Bidding
Colorado Springs, CO 80903

Plumbing Subcontractor Alamosa
Term Contract
Sub-Bidding
Alamosa, CO 81101

As-Needed Water Coolers Services
Term Contract
Post-Bid
Aspen, CO

Plumbing- Version 2
Term Contract
Post-Bid
Denver, CO

2Da--575 - (Con) Install Secondary Domestic Water Service
Term Contract
Results
$25,000 to $100,000 est. value
Grand Junction, CO 81501

Hatch House Plumbing Replacement
Renovation
Results
$171,389 CJ est. value
Pitkin, CO 81241

Rio Blanco Outlet Rehabilitation
Infrastructure
Construction
$265,888 CJ est. value
Meeker, CO 81641

Plumbing subcontractor/ Loveland Co.
Term Contract
Sub-Bidding
Loveland, CO 80537

Plumbing Installation Camper Registration Building
Alteration
Post-Bid
Walden, CO 80480

Collbran Job Corps Center Dormitory HVAC and Hot Water Heater Replacement
Term Contract
Results
$25,000 to $100,000 est. value
Collbran, CO 81624

Plumbing Subcontractor - Sterling
Term Contract
Sub-Bidding
Sterling, CO 80751

Shower Panel Replacement
Alteration
Post-Bid
$200,000 est. value
Pueblo, CO 81003

ADA Restrooms at Historic City Hall
Alteration
Results
Brighton, CO 80601

Last Updated 05/24/2023 08:02 AM
Project Title

2023 Cedar Street Improvement Project

Physical Address View project details and contacts
City, State (County) Cortez, CO 81321   (Montezuma County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,596,803 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 23, 2023, project was awarded to Candelaria Construction, Inc., and the awarded amount is $1,596,803.04** The project consists of the installation of approximately: 7500 SY of roadway excavation, base course fill, and asphalt paving. Concrete Flatwork: 640 LF of curb & gutter; 115 SY of curb ramps; 180 SY of sidewalk. Waterline Removal: 1740 LF of 6-inch cast-iron line; 5 EA metallic service lines. Waterline Installation: 1740 LF of 8-inch water line; 5 EA service line connections, house services, and all fittings. Sewer Main: remove and replace 1540 LF of 8-inch sewer main, 4 manholes, and new house service connections. All work is located within the Cortez City limits. Contractor must attend mandatory pre-bid meeting to bid. Bids placed before the mandatory pre-bid meeting shall be invalidated by non-attendance. Question Acceptance Deadline 03/29/2023 12:00 PM EDT

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents