Similar Projects
Libbey Parkway Replacement Well Implementation - General Bids
Infrastructure
Bidding
Weymouth, MA

Cyr Street Wells No 4 and No 5 Improvements
Alteration
Bidding
$200,000 est. value
West Bridgewater, MA 02379

Assabet Well No 3 Connection - Sub Bid
Infrastructure
Sub-Bidding
$950,000 est. value
Acton, MA

Cleaning, Redevelopment and Chemical Treatment of Gravel Packed Wells
Post-Bid
Less than $82,000 est. value
Walpole, MA

Well No. 3 Upgrades - General Bids
Post-Bid
Less than $750,000 est. value
Littleton, MA

Heather Row Grinder Pump (Furnish and Install)
Results
$225,000 est. value
Tewksbury, MA

GP 1 Replacement Well Implementation - General Bids
Results
$350,000 est. value
Seekonk, MA

Multi-Year Well Cleaning and Redevelopment for FY 2022 to FY 2024
Term Contract, Infrastructure
Bidding
$100,000 est. value
Chelmsford, MA

Backwash Pump VFD Project
Post-Bid
Walpole, MA 02081

Decommissioning of a Former Water Well
Results
$15,000 to $25,000 est. value
Huntington, MA

Wells 1, 2, and 4R PFAS Treatment Equipment
Infrastructure
Bidding
$2,000,000 est. value
North Easton, MA

Dewatering Pump Restoration and Maintenance Service, Diesel Powered
Post-Bid
Charlestown, MA

Construction of Two Gravel-Packed Wells for Municipal Water Supply, and Decommissioning of Four Municipal Wells
Results
$475,000 est. value
South Dartmouth, MA 02748

Cuttyhunk Island Wellfield Replacement
Infrastructure
Bidding
$350,000 est. value
Gosnold, MA

Well Cleaning 2 and 8 Redevelopment
Post-Bid
Sudbury, MA

Last Updated 11/17/2021 06:26 AM
Project Title

Booster Station Rental

Physical Address View project details and contacts
City, State (County) Barnstable, MA   (Barnstable County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The rental of a Booster Station (Booster Pump & Power/Engine) for an upcoming dredging project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents