Similar Projects
Master Plan Development
New Construction - 162,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Castle Rock, WA

Crescent Harbor Elementary School
New Construction
Conception
$68,000,000 est. value
Oak Harbor, WA 98277

Tennant Trailhead
Renovation
Design
$400,000 est. value
WA

Joc King County
Renovation
Design
$6,000,000 est. value
WA

ESD112 - 49th Center Renovation
Renovation
Bidding
$1,800,000 est. value
Vancouver, WA 98682

Metaline Falls Portage Park Design-Build Project
New Construction
Bidding
$2,200,000 to $2,500,000 est. value
Metaline Falls, WA 99153

Challenger and Horizon Elementary Schools, Bid Packages - 6.1, 7.1, 9.1, 9.2, 9.3, 9.4, 9.5, 9.6, 10.1, 11.1, 32.3, 32.4
New Construction
Sub-Bidding
$4,850,560 est. value
Everett, WA

Jax Apartments
New Construction - 57,400 SF
Post-Bid
Vancouver, WA 98686

Engineering Services for 2021 Green to Cedar Rivers Trail Project
Infrastructure
Post-Bid
$400,000 est. value
Seattle, WA

Deschutes Falls Park Walkway And Viewing Platform
Infrastructure
Results
$320,000 to $460,000 est. value
Olympia, WA

2021-2022 Master Planning: Beaton Hill Park And Big Rock Park South
New Construction, Infrastructure
Results
$275,000 est. value
Sammamish, WA 98074

Sunnyland Elementary School
Renovation, Addition
Pending Verification
Bellingham, WA 98225

Oak Harbor Elementary School
New Construction
Conception
$75,000,000 est. value
Oak Harbor, WA 98277

Tennant Trailhead
Renovation
Design
$1,400,000 est. value
WA

City Park Playground Replacement
New Construction
Post-Bid
Prosser, WA 99350

Last Updated 06/22/2022 01:24 AM
Project Title

Richard Gordon Elementary School Playfield Improvements

Physical Address View project details and contacts
City, State (County) Kingston, WA 98346   (Kitsap County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Proposed Improvements scope of work includes but is not limited to the existing 1.69 acres of the upper southern playfield. Improvements include the installation of an underdrain system in the play field area south of the main building, an asphalt walking path around the play field. along with a new concrete accessible ramp at the north end of the play field.

Details

Elementary School, Renovation, Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents