Similar Projects
SH 103 Culvert Replacement
Post-Bid
Idaho Springs, CO 80452

High Point Neighborhood Park West
Post-Bid
Denver, CO

2019 Bayfield Culvert Repair
Results
$200,000 to $300,000 est. value
Bayfield, CO 81122

Embankment Material
Results
CO

Detention Ponds Improvement Project
Post-Bid
Golden, CO

Installs Soldier Piles and Reinforced Facing Along A Cantilevered Concrete Retaining Wall That Was Undermined From North Clearcreek Scour
Results
Less than $1,000,000 est. value
CO

District Infrastructure To Service Solstice Filings 2-4
Post-Bid
Centennial, CO

Culvert Relining (Spray-Applied)
Results
Less than $1,000,000 est. value
CO

Constructing Two Extended Detention Basins, Trenching, and Drainage Pipe
Post-Bid
$5,000,000 to $20,000,000 est. value
CO

Suckla #1 Reclamation
Results
Less than $25,000 est. value
Naturita, CO 81422

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

Pipe Supply for City Streets Division
Results
Grand Junction, CO 81501

Detention Pond Improvements
Post-Bid
Golden, CO

Pmaa, Wray SFU - Pond Liners
Results
Less than $361,669 est. value
Wray, CO 80758

2020 Culvert Pipe Maintenance Services
Term Contract
Post-Bid
Brighton, CO 80601

Last Updated 05/29/2020 03:32 AM
Project Title

Construction of Water Quality Ponds (E and G) South of US 50

Physical Address View project details and contacts
City, State (County) CO   (Pueblo County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of water quality ponds (E & G) south of US 50. Work will include grading, construction signing, pipe installation, and other items as indicated in the plans. 201-00000 Clearing and Grubbing 1.000 L S 203-00010 Unclassified Excavation (Complete In Place) 51,984.000 CY 207-00205 Topsoil 15,060.000 CY 208-00007 Erosion Log Type 2 (8 Inch) 16,600.000 LF 208-00107 Removal of Trash 200.000 HOUR 208-00207 Erosion Control Management 108.000 DAY 212-00006 Seeding (Native) 28.000 ACRE 213-00002 Mulching (Weed Free Hay) 28.000 ACRE 213-00061 Mulch Tackifier 5,600.000 LB 216-00201 Soil Retention Blanket (Straw-Coconut) (Biodegradable Class 1) 54,300.000 SY 304-06000 Aggregate Base Course (Class 6) 358.000 TON 506-00212 Riprap (12 Inch) 668.000 CY 601-01000 Concrete Class B 334.000 CY 603-01245 24 Inch Reinforced Concrete Pipe (Complete In Place) 418.000 LF 604-30010 Manhole Slab Base (10 Foot) 8.000 EACH 607-53172 Fence Chain Link (72 Inch) 1,410.000 LF 625-00000 Construction Surveying 1.000 L S 626-00000 Mobilization 1.000 L S 630-00000 Flagging 326.000 HOUR 630-00012 Traffic Control Management 106.000 DAY

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents