Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Governors Island Lighting Infrastructure
Infrastructure
Sub-Bidding
$800,000 CJ est. value
New York, NY 10004

Aquatics Locker Room Rehabilitation - Electrical Contract
Renovation
Sub-Bidding
$2,200,000 CJ est. value
New York, NY 10031

Cioffe Borough Repair Shop, Lincoln Center Garage Lighting
Alteration
Post-Bid
New York, NY 10065

Gansevoort Peninsula Building Electrical
Alteration
Post-Bid
New York, NY

Installation of Emergency Lights and Equipment
Term Contract
Results
New York, NY

Rehabilitate Elevators, Buildings 4 and 5 - Electrical
Infrastructure
Results
$1,000,000 to $2,000,000 est. value
New York, NY 10032

Furnish, Deliver and Install Signage
Infrastructure
Sub-Bidding
$60,000 CJ est. value
New York, NY 10019

Pier 97 Building Electrical Construction
Alteration
Post-Bid
New York, NY 10014

Emergency Backup Network Power and Asbestos Abatement
Alteration
Results
$6,500,000 to $7,250,000 est. value
New York, NY

Lighting Upgrade
Alteration
Post-Bid
New York, NY 10029

Citywide Sustainability and Energy-Efficiency Utility Systems Reconstruction
Alteration
Results
$3,000,000 to $5,000,000 est. value
New York, NY

Circuit Breakers & Test Equipment
Term Contract
Post-Bid

Maintenance and Repair of Two(2) Kawasaki Gas Turbine Generators
Alteration
Results
Manhattan, NY

Exterior Sign & Lighting Maintenance
Alteration
Post-Bid

Last Updated 12/01/2022 09:40 AM
Project Title

CUNY City College of New York Shepard Hall IT Upgrade and Associated Asbestos Abatement

Physical Address View project details and contacts
City, State (County) New York, NY 10027   (New York County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status All Submissions Received, Selection Underway, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $4,100,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

** As of December 1, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Installation of the new data and voice network to upgrade existing IT services in Shepard Hall building in City College of New York. Work includes construction of new MDF and several IDF closets with all associated General Construction, Mechanical and Electrical work, installation of new cabling throughout the existing and occupied building, installation of new electrical risers, removal of existing cabling, and other related work. Work involves extensive work within occupied academic building with emphasis on scheduling and coordination of work to minimize the impact of the work on the operations of the Facility. Estimated cost for this work is in the range of $3.9M to $4.1M CR Number: 2089653 The Dormitory Authority of the State of New York (DASNY) has determined that its interest in obtaining the best work at the lowest possible price, preventing favoritism, fraud and corruption, and other considerations such as the impact of delay, the possibility of cost savings advantages and any local history of labor unrest are best met by use of a Project Labor Agreement (PLA) on this Project. The successful low bidder, as a condition of being awarded this Contract, will be required to execute the PLA described in the Information for Bidders and included in the Contract Documents. See Section 18.0 of the Information for Bidders of the Contract Documents for additional information. All subcontractors of every tier will be required to agree to be bound by the PLA. Contractors with verifiable experience in similar work. Special requirements for IT cabling subcontractors are listed in the General Requirements. Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 18% Women Owned Sub-Contracting Goal: 8% Service-Disabled Veteran-Owned Business Contracting Goal: 3% Contract term: December 13, 2024 County(ies): Bronx, Kings, New York, Queens, Richmond *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents