Similar Projects
Last Updated | 10/04/2022 01:10 PM |
Project Title | Bridge Construction SFIR 3(1) |
Physical Address | View project details and contacts |
City, State (County) | Elko, NV 89801 (Elko County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bridge Construction SFIR 3(1). The U.S. Department of Interior, Bureau of Indian Affairs, Western Regional Office, Phoenix, AZ intends to issue an Invitation for Bid (IFB) Solicitation for Project SFIR 3(1), INDIAN BEND BRIDGE - CONSTRUCTION SERVICES - SOUTH FORK BAND OF THE TE-MOAK TRIBE: Acquire labor, equipment, materials and services to remove and dispose existing debris from former bridge, grade, drain and place aggregate surface course on 0.26 miles of roadway and construct a new bridge on Route 3 on the South Fork Indian Reservation, Elko County, Nevada. Technical specifications are to be Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 with modification in the Special Contract Requirements. The Contractor shall provide all labor and supervision, materials, and equipment required to complete the requirement. Project no. 140A1122B0003 Contractor shall make a one-time payment to the Humboldt Watershed Cooperative Weed Management Area (HWCWMA) and construct approximately 100 LF of rail bank protection along the South Fork of the Humboldt River approximately 3 miles from the project bridge site. The rail bank protection limits will be staked in the field by the COR The applicable North American Industry Classification System (NAICS) code for this acquisition is 237130. In accordance with Federal Acquisition Regulation (FAR) 36.204, the magnitude of this project is currently estimated to be between $1,000,000.00 and $5,000,000.00. The project Performance Period will be 210 calendar days from the effective Notice to Proceed date. Bid Bond is required - 20% of the Bid price. The Government intends to award a Firm Fixed Price Construction Contract. Estimated Price Range: Between $1,000,000.00 and $5,000,000.00. Requirement: SFIR 3(1), INDIAN BEND BRIDGE - CONSTRUCTION SERVICES - SOUTH FORK BAND OF THE TE-MOAK TRIBE: Acquire labor, equipment, materials and services to remove and dispose existing debris from former bridge, grade, drain and place aggregate surface course on 0.26 miles of roadway and construct a new bridge on Route 3 on the South Fork Indian Reservation, Elko County, Nevada. By Reference - Applicable Davis Bacon Wage Determination No.: NV20220002 03/11/2022 - SF 1442 SOLICITATION, OFFER, AND AWARD - TABLE OF CONTENTS - SECTION B SUPPLIES OF SERVICES - SECTION C DESCRIPTION AND SPECIFICATIONS - SECTION E INSPECTION AND ACCEPTANCE *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |