Similar Projects
Campus Infrastructure Support Construction - Prairie View A&M University
Infrastructure
Conception
$8,000,000 CJ est. value
Prairie View, TX 77446

Twinwood Business Park Building 4
New Construction, Infrastructure - 181,241 SF
Design
$8,875,511 CJ est. value
Brookshire, TX 77423

Twinwood Business Park Building 2
New Construction, Infrastructure - 91,288 SF
Design
$4,880,679 CJ est. value
Brookshire, TX 77423

Sunterra Section 48 Water, Sanitary, and Drainage Facilities
Infrastructure
Bidding
$1,386,593 CJ est. value
Hempstead, TX 77445

Water Distribution, Wastewater Collection, Storm Water Facilities and Paving to Serve Attwater, Section One
Infrastructure
Bidding
$1,500,000 CJ est. value
Hempstead, TX 77445

Texas Heritage Parkway Section 3C
Infrastructure
Post-Bid
$3,900,000 CJ est. value
Hempstead, TX 77445

Starbucks / Prairie View - Site Work Bid
New Construction, Infrastructure - 2,016 SF
Post-Bid
$100,000 CJ est. value
Prairie View, TX 77445

Mass Grading and Detention Improvements for Lakeview
Infrastructure
Results
TX

US0290 - Pump Station and Drainage System Cleaning
Infrastructure
Results
$250,400 est. value
TX

O'Reilly Auto Parts (BKS) #6256 / Brookshire
New Construction, Infrastructure - 7,650 SF
Construction
$1,300,000 CJ est. value
Brookshire, TX 77423

Construction of Water, Sanitary, and Drainage Facilities in Sunterra Section 31
Infrastructure
Pending Verification
$890,508 CJ est. value
Hempstead, TX 77445

Tamarron West Rec Center
New Construction, Infrastructure - 11,865 SF
Pending Verification
$2,500,000 CJ est. value
Brookshire, TX 77423

Twinwood Business Park / Building 1
New Construction, Infrastructure - 91,400 SF
Design
$4,888,208 CJ est. value
Brookshire, TX 77423

Water Distribution, Wastewater Collection, Storm Water Facilities and Paving to Serve Attwater, Section One
Infrastructure
Bidding
$600,000 CJ est. value
Hempstead, TX 77445

Villa Capri Subdivision Wastewater Pump Station and Waterline Replacement
Renovation, Infrastructure
Post-Bid
$160,000 CJ est. value
Prairie View, TX 77446

Last Updated 06/28/2023 04:08 PM
Project Title

Water Supply and Storage Facility Phase 1 to serve La Segarra

Physical Address View project details and contacts
City, State (County) Brookshire, TX 77423   (Waller County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $5,049,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Waller County Municipal Utility District No. 45 Water Supply and Storage Facility Phase 1 to serve La Segarra Project scope shall include the construction of a water storage and supply facility including; a deep gravel water well with a 900 gpm pump, two (2) 150,000 gallon ground storage tanks; a 15,000 gallon hydropneumatic tank; three (3) 700 gpm booster pumps; and all associated site and electrical work. It is the responsibility of the Contractor bidding the project to ensure the accuracy of the reproduction of all Bid Documents and Construction Drawings. This includes, but is not limited to, proper scaling, paper width and length, etc. Failure to do so may result in errors in the Unit Bid Quantities and/or Bid Amounts. JOB NO. 211-127-11

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents